<br />PUBW2020-10R Page 3 of 7 <br /> <br />there is a conflict between the Cost Participation Policy and this Agreement, this <br />Agreement will prevail. <br />4.2. A list of the construction pay items and percentages of City funding responsibility <br />as well as the total estimated City Project cost is attached as Attachment B. Cost <br />Participation Based on Engineer’s Estimate). Quantities and unit prices in <br />Attachment B are estimates. Actual costs shall be based on the contract unit <br />prices and the quantities constructed. <br /> <br />4.3. Mobilization, Field Office, Erosion Control Supervisor, Traffic Control, As Built, <br />Construction Staking, Erosion Control Items (such as Storm Drain Inlet Protection, <br />Water, Street Sweeper) are defined collectively as the “Prorated Items”. The City <br />percentage of the Prorated Items is calculated as follows: <br /> <br />(City Cost excluding the Prorated Items Cost) <br />City % Prorated Items = <br />(Total Project Cost excluding the Prorated Items Cost) <br /> <br />The costs in the Prorated Items calculation will be based on contract unit prices <br />and quantities at the time of contract award. No adjustments in the percentages <br />will be made if unit prices or quantities vary during construction. <br /> <br />4.4. Design Engineering Costs <br /> <br />4.4.1. The City shall pay the County a design engineering fee equal to a <br />percentage of the identified City project items as detailed in Attachment B. <br /> <br />4.4.2. Design engineering fees shall be calculated based on the quantities and <br />unit prices at the time of contract award. <br /> <br />4.5. Construction Engineering Costs <br /> <br />4.5.1. The City shall pay the County a construction engineering fee equal to a <br />percentage of the identified City project items as detailed in Attachment B. <br /> <br />4.5.2. Construction engineering and administration fees shall be calculated <br />based on the final contract quantities and unit prices. <br /> <br />5. Payment Schedule <br /> <br />5.1. Design engineering will be invoiced at the time of contract award. <br /> <br />5.2. The County will invoice the City for construction costs incurred on a monthly basis <br />or as determined by the payment schedule for the contractor. <br /> <br />5.3. Construction engineering will be invoiced at the time of substantial project <br />completion, as determined by the County.