My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-20 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2020
>
09-09-20 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 3:16:00 PM
Creation date
12/10/2020 3:15:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – September 9, 2020 9 <br /> <br />2. The Preliminary Plat approval shall expire six months from the date of the City Council <br />approval unless the Final Plat has recorded with Ramsey County or a time extension <br />granted by the City Council. <br />3. The Applicant shall record the Final Plat with Ramsey County and a copy shall be <br />provided to the City within sixty (60) days of the City’s approval. <br />4. The Applicant shall be financially responsible for all applicable water and sanitary <br />charges. Rates applied shall be those in effect at the time of Final Plat approval and shall <br />be memorialized in the Development Agreement. <br />5. A Development Agreement shall be prepared by the City Attorney and subject to City <br />Council approval. The Development Agreement shall be fully executed prior to release of <br />a building permit. <br />6. The Applicant shall submit a park dedication fee that shall be seven and a half (7.5) <br />percent of the fair market value of the unimproved land and subject to the approval of the <br />City Council. The park dedication fee shall be submitted prior to the release of the Final <br />Plat. <br />7. Survey monuments shall be placed and installed at all block corners, angle points, points <br />of curves in streets, and at intermediate points as shown on the Final Plat. Pipes or steel <br />rods shall be placed at the corners of each lot. <br />8. The final plat shall provide dedication of a 60-ft wide right of way for Gateway <br />Boulevard on Lot 2, Block 1 overlying the area currently encumbered by existing <br />drainage and utility easement. <br />9. Prior to the issuance of a grading and erosion permit, planning staff shall approve in <br />writing the final landscaping plan. <br />10. Prior to the issuance of a grading and erosion permit, engineering staff shall approve in <br />writing the final location of the loading driveway access to align with adjacent <br />commercial driveway or provide adequate offset distance. <br />11. A cross easement access and maintenance agreement for the proposed share access on Lot <br />2 shall be submitted and memorialized in the Development Agreement. <br />12. Site Plan approval shall be required for the construction of the proof of parking area. <br />13. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br />shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br />lenses. Other than wash or architectural lighting, attached security lighting shall be <br />shoebox style, downward directed with flush lenses. If complaints are received the <br />lighting adjacent to residential uses shall utilize house shields as directed by the City. In <br />addition, any lighting under canopies (building entries) shall be recessed and use a flush <br />lens. <br />14. A right of way permit shall be required for work performed within the City right of way. <br />15. A grading as-built and utility as-built plan shall be provided to the City upon completion <br />of grading and utility work. <br />16. No exterior storage shall be permitted. <br />17. This approval does not include signs. A separate sign permit is required for all proposed <br />signage. All signage shall meet the requirements of Sign District 6. <br />18. Prior to the issuance of a building permit, a landscape financial security of $50,000.00 <br />dollars shall be submitted. Landscape financial security is held for two full growing <br />seasons. <br />19. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements.
The URL can be used to link to this page
Your browser does not support the video tag.