Laserfiche WebLink
Design Alternative No. 1 <br />Corridor Challenges <br />Steep slopes at multiple locations <br />Vertical elevation difference up to 25 feet <br />Wetlands, power poles, trees, landscape features <br />Soil contamination at two locations <br />Schematic Design Layout <br />Narrow road width to 28 feet, with curb and gutter <br />Place trail adjacent to back of curb, similar to 2018 trail project <br />Requires storm sewer system and storm water management per RCWD <br />Compounding costs associated with storm sewer and soil disturbance <br />Slide 4