My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-08-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
02-08-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 3:31:14 PM
Creation date
2/4/2021 3:28:10 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 4 <br />212751v1 <br /> 8. IMPROVEMENTS. The Developer shall install and pay for the following as required <br />to be built within the project as private improvements in accordance with the approved Plans: <br /> A. Sanitary Sewer System <br /> B. Water System <br /> C. Storm Sewer System <br /> D. Parking Lots <br /> E. Streets, Alleys and Driveways <br /> F. Concrete Curb and Gutter <br /> G. Street lights <br /> H. Site Grading, Ponding, and Erosion Control <br /> I. Landscaping <br /> J. Underground Utilities <br /> K. Setting of Iron Monuments, including Monuments described in the <br />Wetland Overlay District <br /> L. Surveying and Staking <br /> M. Sidewalks and Trails <br /> N. Traffic Control Signs <br /> <br />The improvements shall be installed in accordance with the City Code. The Developer will not use power <br />equipment between the hours of 7 o’clock p.m. and 7 o’clock a.m. The Developer shall submit plans and <br />specifications for permit which have been prepared by a competent registered professional engineer to the <br />City for approval by the City Engineer which approval shall be provided on the condition that such <br />submittals comply with the Plans and this Agreement. The Developer shall instruct its engineer to provide <br />adequate field inspection personnel to assure an acceptable level of quality control. In addition, the City <br />may, at the City's discretion and at the Developer's expense, have one or more City inspectors and a soil <br />engineer inspect the work as the City may reasonably determine. The Developer, its contractors and <br />subcontractors, shall follow all instructions received from the City's inspectors. The Developer's engineer <br />shall provide for on-site project management. The Developer's engineer is responsible for design changes <br />and contract administration between the Developer and the Developer's contractor. The Developer or his <br />engineer shall schedule a pre-construction meeting at a mutually agreeable time at the City Council
The URL can be used to link to this page
Your browser does not support the video tag.