Page 7 of 8 <br /> <br />In addition, any lighting under canopies (building entries) shall be recessed and use a <br />flush lens. <br />14. A grading as-built and utility as-built plan shall be provided to the City upon <br />completion of grading and utility work. <br />15. Prior to issuance of a sign grading and erosion control permit, the applicant shall <br />provide City staff with written approval from Bethel University, the owner of Outlot <br />A, permitting the placement of landscaping on their property. <br />16. Prior to issuance of a sign permit, the applicant shall provide City staff with written <br />approval from Bethel University, the owner of Outlot A, permitting the construction <br />of the proposed monument sign on their property and offsite signs are not permitted. <br />17. Prior to issuance of a sign permit, the applicant shall provide City staff with written <br />approval from Lake Johanna Fire Department, the owner of Lot 2, Block 1, on <br />permitting the placement of landscaping on their property. <br />18. No exterior storage shall be permitted. <br />19. All rooftop or ground mounted mechanical equipment shall be hidden from view with <br />the same materials used on the building in accordance with City Code requirements. <br />20. All fencing and retaining wall materials shall be complementary to the building <br />materials and shall be approved in writing by the Planning Division prior to issuance <br />of a building permit. Retaining walls greater than four (4) feet in height shall be <br />engineered and detailed calculations shall be submitted to the City. <br />21. A Grading and Erosion permit shall be obtained from the City’s Engineering <br />Department prior to commencing any grading, land disturbance or utility activities. <br />The Developer shall be responsible for obtaining any permits necessary from other <br />agencies, including but not limited to, MPCA, Rice Creek Watershed District, <br />Ramsey County and MNDOT prior to the start of any site activities. <br />22. A grading as-built and utility as-built plan shall be provided to the City upon <br />completion of grading and utility work. <br />23. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any <br />and all stormwater runoff, sediments and debris during all construction activities. <br />Temporary stormwater facilities shall be installed to protect the quality aspect of the <br />proposed and existing stormwater facilities prior to and during construction activities. <br />Maintenance of any and all temporary stormwater facilities shall be the responsibility <br />of the Applicant. <br />24. The Applicant shall provide an executed copy of the City’s standard stormwater <br />maintenance and easement agreement prior to approval of the Development <br />Agreement. <br />25. The bond or surety shall be provided prior to the issuance of any building or grading <br />permits and shall be valid for two full years from the date of installation, or three <br />years in the case of an extended timeline. The total surety shall be addressed in the <br />Development Agreement. <br />26. All disturbed boulevards shall be restored with sod. All areas of the site, where <br />practical, shall be sodded or seeded and maintained. The property owner shall mow <br />and maintain all site boulevards to the curb line of the public streets. <br />27. The maximum number of units permitted onsite is 146 units. <br />28. The Applicant shall be financially responsible for all applicable water and sanitary <br />charges. Rates applied shall be memorialized in the Development Agreement. <br />29. Prior to the issuance of a land disturbance permit, the Applicant shall submit an <br />operation and maintenance plan for the long-term care of all on-site and off-site <br />stormwater, sanitary sewer, and water main to the City for review and approval. The