Laserfiche WebLink
WATER RESOURCES NOTESSTORM WATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE (CONTINUED)REVIEW ALL PERMITS FOR ANY SPECIAL CONDITIONS THAT WILL EFFECT CONSTRUCTION OF THE PROJECT.TEMPORARY DEWATERING ACTIVITIES MAY BE REQUIRED FOR ROADWAY CONSTRUCTION AND UTILITY WORK. THEREFORE IT IS POSSIBLE THAT A PERMITFOR THE TEMPORARY APPROPRIATION OF WATERS OF THE STATE, NON-IRRIGATION FROM MNDNR WILL BE REQUIRED FOR THIS PROJECT. THECONTRACTOR IS RESPONSIBLE FOR OBTAINING THIS PERMIT PRIOR TO COMMENCING DEWATERING ACTIVITIES. ALL TEMPORARY DEWATERING SHALL BEDISCHARGED TO AN APPROVED LOCATION FOR TREATMENT PRIOR TO DISCHARGE TO THE RECEIVING WATER. SUBMIT A SITE MANAGEMENT PLAN TO THEPROJECT ENGINEER FOR APPROVAL PRIOR TO COMMENCING WORK.TYPE OF PERMITAGENCYDEPARTMENT OF NATURAL RESOURCES (DNR)GROUNDWATER APPROPRIATIONSTHESE NOTES ALONG WITH THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE ARE INTENDED TO GIVE INFORMATION ON CRITICAL DRAINAGE FEATURES,NATURAL RESOURCES AND CONTRACTOR OPERATIONS THAT MAY IMPACT DRAINAGE AND NATURAL RESOURCES.1. CHANGING THE DIRECTION OF FLOW FROM WHAT IS SHOWN ON THE PLANS MAY CAUSE PROBLEMS OFF THE PROJECT AND COULD MEAN THE PROJECT IS OUT OFCOMPLIANCE WITH APPROVED DRAINAGE PERMITS.2. FOR FINAL SITE STABILIZATION, PROVIDE AT LEAST SIX INCHES OF TOPSOIL OR ORGANIC MATTER TO BE INCORPORATED INTO THE UNDERLYING SOIL WHEREVER TOPSOILHAS BEEN REMOVED.3. ANY SUBSURFACE DRAINAGE TILES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED, REPLACED OR REROUTED, AND CONNECTED TO THE EXISTING TILE ORDRAINAGE SYSTEM TO ENSURE THAT EXISTING UPLAND DRAINAGE IS PERPETUATED. THIS SHOULD BE DONE TO THE APPROVAL AND SATISFACTION OF THE PROJECTENGINEER.4. THE FOLLOWING WATER RELATED PERMITS APPLY TO THIS PROJECT:COURT INTERNATIONAL BUILDING2550 UNIVERSITY AVENUE W., SUITE 400NST. PAUL, MINNESOTA 55114-1052P: 651.644.4389 F: 651.644.9446J:\2019\191557.01\CAD\Dwgs\Sheets\46.dwg6/24/2020 11:47:53 AMXrefs: xgt-1-dh01-bdr-full <br />06/22/2006/22/20