My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2021
>
01-25-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 10:36:21 AM
Creation date
2/23/2021 10:35:09 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL — JANUARY 25, 2021 12 <br />10. The Applicant shall submit cash contribution in lieu of land dedication. The cash payment <br />shall be determined based on the fair market of 20 percent of the land that would otherwise <br />be dedicated to the City. The park dedication fee shall be submitted prior to the issuance of <br />a building permit. <br />11. Prior to the issuance of a grading and erosion permit, planning staff shall approve in <br />writing the final landscaping plan. <br />12. Prior to the issuance of a grading and erosion control permit the Applicant shall work with <br />the City to locate the additional caliper inches of replacement trees on the site or on the <br />adjacent properties. If the replacement tree plantings cannot be reasonably accommodated <br />on the site, the City can work with the applicant to find off -site locations for the plantings <br />or require that a fee in lieu of the plantings be provided. <br />13. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br />shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br />lenses. Other than wash or architectural lighting, attached security lighting shall be <br />shoebox style, downward directed with flush lenses. If complaints are received the lighting <br />adjacent to residential uses shall utilize house shields as directed by the City. In addition, <br />any lighting under canopies (building entries) shall be recessed and use a flush lens. <br />14. A grading as -built and utility as -built plan shall be provided to the City upon completion <br />of grading and utility work. <br />15. Prior to issuance of a sign grading and erosion control permit, the applicant shall provide <br />City staff with written approval from Bethel University, the owner of Outlot A, permitting <br />the placement of landscaping on their property. <br />16. Prior to issuance of a sign permit, the applicant shall provide City staff with written <br />approval from Bethel University, the owner of Outlot A, permitting the construction of the <br />proposed monument sign on their property and offsite signs are not permitted. <br />17. Prior to issuance of a sign permit, the applicant shall provide City staff with written <br />approval from Lake Johanna Fire Department, the owner of Lot 2, Block 1, on permitting <br />the placement of landscaping on their property. <br />18. No exterior storage shall be permitted. <br />19. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements. <br />20. All fencing and retaining wall materials shall be complementary to the building materials <br />and shall be approved in writing by the Planning Division prior to issuance of a building <br />permit. Retaining walls greater than four (4) feet in height shall be engineered and detailed <br />calculations shall be submitted to the City. <br />21. A Grading and Erosion permit shall be obtained from the City's Engineering Department <br />prior to commencing any grading, land disturbance or utility activities. The Developer <br />shall be responsible for obtaining any permits necessary from other agencies, including but <br />not limited to MPCA, Rice Creek Watershed District, Ramsey County and MNDOT prior <br />to the start of any site activities. <br />22. A grading as -built and utility as -built plan shall be provided to the City upon completion <br />of grading and utility work. <br />23. The Applicant shall be responsible for protecting the proposed on -site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />
The URL can be used to link to this page
Your browser does not support the video tag.