My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-15-21-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
03-15-21-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 4:16:20 PM
Creation date
3/11/2021 4:15:00 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br /> <br /> Arden Oaks Drive (Remainder): Spot repair of damaged curb sections, repair or replace storm <br />structures, full-depth reclaim of existing pavement, and placement of new 4-inch bituminous <br />pavement mat. Existing ductile iron water main and PVC sanitary sewer to remain in-place. <br /> Arden Oaks Circle: Spot repair of damaged curb sections, repair or replace storm structures, <br />full-depth reclaim of existing pavement, and placement of new 4-inch bituminous pavement <br />mat. Existing ductile iron water main and PVC sanitary sewer to remain in-place. <br /> <br /> <br />Preliminary Project Budget <br />A preliminary project cost estimate for proposed improvements within the Arden Oaks project area <br />described above is provided in Attachment D. The cost estimate was derived from the above <br />anticipated project elements listed. The initial cost estimate is summarized in the following table <br />and will be revised as part of the feasibility report. This estimate includes the anticipated costs for <br />engineering design, surveying, and construction administration as a 20% contingency. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />* Initial estimate subject to revisions during the feasibility study <br /> <br />The City’s Special Assessment Policy will be used to prepare a preliminary assessment roll as part <br />of the feasibility report. The policy states that the City will assess fifty percent of the total cost for <br />street reconstruction and fifty percent of the cost of bituminous overlay for a typical residential <br />street section on a unit basis. The feasibility report will include a review of special assessment <br />rates applied to past projects in the City of Arden Hills. Staff will review anticipated special <br />assessments with the City Council prior to completing the feasibility report. <br /> <br /> <br />Preliminary Project Schedule <br />This project is proposed to be designed separately from the Snelling Ave Improvements but would <br />go out to bid during the same 2022 season to strategically bring in competitive bids. The following <br />is a preliminary project delivery schedule for the 2022 PMP project. A refined project schedule <br />will be provided within the feasibility report. <br /> <br />Category Estimated Cost <br /> <br />CIP Budget <br /> Streets $452,978 <br />$700,000 <br /> Storm Drainage $72,802 <br />$60,000 <br /> Sanitary Sewer $14,400 <br /> <br />$42,000 <br /> Water Utility $2,160 <br />$25,000 <br />TOTAL $542,340 <br />$827,000
The URL can be used to link to this page
Your browser does not support the video tag.