Laserfiche WebLink
<br />Project Name: Arden Oaks Street Improvements <br />Arden HIlls, Minnesota <br />Project Number PW-21-0109 <br />Item No.Item Unit Unit Price Est. Quantity Total Price <br />2021.501 MOBILIZATION LS 25,000.00 <br />2540.602 TEMPORARY MAILBOX BANK EACH 35.00 10.00 350.00 <br />2540.602 RELOCATE/REINSTALL MAILBOX EACH 135.00 10.00 1,350.00 <br />2563.601 TRAFFIC CONTROL LS 15,000.00 <br />SUBTOTAL - GENERAL AND REMOVALS 41,700$ <br />CONTINGENCY (20%)8,340$ <br />TOTAL - GENERAL AND REMOVALS 50,040$ <br />2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT 4.00 2,500.00 10,000.00 <br />2104.505 REMOVE CONCRETE DRIVEWAY APRON SQ YD 10.00 200.00 2,000.00 <br />2104.505 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD 10.00 100.00 1,000.00 <br />2104.505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 6.00 100.00 600.00 <br />2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LIN FT 4.00 80.00 320.00 <br />2104.523 SALVAGE SIGNS EACH 50.00 5.00 250.00 <br />2105.501 COMMON EXCAVATION (EV)(P)CU YD 20.00 2,200.00 44,000.00 <br />2105.507 SUBGRADE EXCAVATION CU YD 13.00 200.00 2,600.00 <br />2105.522 SELECT GRANULAR BORROW (CV)CU YD 29.00 750.00 21,750.00 <br />2105.602 POTHOLE EXISTING UTILITIES EACH 535.00 2.00 1,070.00 <br />2123.501 COMMON LABORERS HOUR 83.00 10.00 830.00 <br />2123.507 3.0 CU YD SHOVEL HOUR 182.00 10.00 1,820.00 <br />2123.61 STREET SWEEPER (WITH PICKUP BROOM)HOUR 152.00 15.00 2,280.00 <br />2130.501 WATER FOR DUST CONTROL M GALS 34.00 50.00 1,700.00 <br />2211.501 AGGREGATE BASE, CLASS 5 TON 18.00 500.00 9,000.00 <br />2331.604 <br />AGGREGATE BASE, CLASS 7, FULL DEPTH <br />RECYCLED PRODUCTION SQ YD 4.00 8,800.00 35,200.00 <br />2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALS 3.50 550.00 1,925.00 <br />2360.501 TYPE SPWEB240C WEARING COURSE MIXTURE TON 80.00 950.00 76,000.00 <br />2360.502 <br />TYPE LVNW35030B NON WEARING COURSE <br />MIXTURE TON 65.00 950.00 61,750.00 <br />2360.503 <br />3.0 IN. WEARING COURSE MIXTURE FOR <br />DRIVEWAYS SQ YD 30.00 200.00 6,000.00 <br />2531.501 CONCRETE CURB AND GUTTER, DESIGN B618 LIN FT 16.00 2,000.00 32,000.00 <br />2531.501 <br />CONCRETE CURB AND GUTTER, DESIGN B618 - <br />HAND FORM LIN FT 28.00 500.00 14,000.00 <br />2531.507 6-INCH CONCRETE DRIVEWAY PAVEMENT SQ YD 61.25 100.00 6,125.00 <br />2506.522 ADJUST FRAME AND RING CASTING EACH 1,000.00 12.00 12,000.00 <br />2504.602 ADJUST GATE VALVE BOX EACH 150.00 12.00 1,800.00 <br />2564.537 INSTALL SALVAGED SIGNS, TYPE "C"EACH 120.00 5.00 600.00 <br />SUBTOTAL - STREET IMPROVEMENTS 346,620$ <br />CONTINGENCY (20%)69,324$ <br />TOTAL - STREET IMPROVEMENTS 415,944$ <br />Arden Oaks <br />GENERAL AND REMOVAL <br />STREET IMPROVEMENTS