Laserfiche WebLink
CONSENT ITEM—7D <br /> ,fi` DEN HILLS <br /> MEMORANDUM <br /> DATE: March 22, 2021 <br /> TO: Honorable Mayor and City Councilmembers <br /> Dave Perrault, City Administrator <br /> FROM: David Swearingen, Interim Public Works Director <br /> SUBJECT: 2021 PMP - Materials Testing <br /> Budgeted Amount: Actual Amount: Funding Source: <br /> $40,000 $ 34,888.00 2021 PMP Overhead Costs <br /> (Included in project overhead costs) <br /> Council Should Consider <br /> Motions to approve, table, or deny the following: <br /> • Proposal for Construction Materials Testing Services with Braun Intertec for the 2021 <br /> PMP Street&Utility Improvements <br /> All items need a simple majority for action unless otherwise noted <br /> Back2round/Discussion <br /> As part of the 2021 PMP Street&Utility Project, materials testing is required to ensure the <br /> quality of work meets the specifications outlined with this project. The project includes elements <br /> such as pavement subgrade preparation, select granular embankment placement, aggregate base <br /> placement, new concrete curb and gutter, sidewalk, driveways, full-depth reclamation and new <br /> bituminous pavement. Improvements to the sanitary, storm, and water main utilities will also be <br /> part of this project. Testing firms use information on what elements and at what quantity are <br /> involved with a project to determine a Schedule of Materials Control which then tells you the <br /> frequency of testing needed. <br /> Page 1 of 2 <br />