My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
03-22-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 6:19:13 AM
Creation date
3/24/2021 11:36:12 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Braun Int Attachment A <br /> B RAU N 11001 Hamps ire AvenueFax: <br /> NTERTE C Minneapolis,MN 55438 Web: braunintertec.com <br /> The Science You Build On. <br /> March 11, 2021 Proposal QTB134946 <br /> Mr. David Swearingen <br /> City of Arden Hills <br /> 1425 Paul Kirkwold Drive <br /> Arden Hills, MN 55112 <br /> Re: Proposal for Construction Materials Testing Services <br /> Arden Hills 2021 PMP Street & Utility Improvements <br /> City Project No. PW-21-0100 <br /> Arden Hills, Minnesota <br /> Dear Mr. Swearingen: <br /> Braun Intertec Corporation is pleased to submit this proposal to provide construction materials testing <br /> services for the Arden Hills 2021 PMP Street & Utility Improvements Project in Arden Hills, Minnesota. <br /> Since our inception in 1957, we have grown into one of the largest employee owned engineering firms in <br /> the nation. With more than 1,000 employee owners, retaining our firm gives you access to a diverse <br /> range of services and professionals you can consult with if the unforeseen occurs. The size of our <br /> company also allows us to respond quickly when schedule constraints occur. <br /> Our White Bear Lake office is located within 15 miles of the site, minimizing travel times and trip <br /> expenses.This proximity also provides the opportunity to quickly mobilize to the site when unforeseen <br /> needs arise. <br /> Our Understanding of Project <br /> This project will include pavement subgrade preparation, select granular embankment placement, <br /> aggregate base placement, new concrete curb and gutter, sidewalk, and driveways along with a new <br /> bituminous pavement in the Hazelnut Park Neighborhood in Arden Hills, Minnesota. Improvements to <br /> the sanitary, storm, and water main utilities will also be part of this project. This project will also include <br /> full depth reclamation, as well as reinstallation of block and wood timber retaining walls. <br /> Available Project Information <br /> This proposal was prepared using the following documents and information. <br /> ■ Project plans and specifications prepared by Bolton & Menk, Inc. dated January 19, 2021. <br /> ■ Discussions with Nick Amatuccio of Bolton and Menk, Inc. about materials testing rates for <br /> project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.