Laserfiche WebLink
<br /> <br />Feasibility Report Page 17 <br />Snelling Avenue North and County Road E - Street and Utility Improvements <br />City Project Number PW 20-0100 <br /> <br /> <br />Private Utilities <br />Construction of a single lane roundabout as shown in Appendix I is anticipated to require <br />relocation of overhead power lines along the west side of Snelling Avenue and may require <br />modification to the natural gas manifold assembly located in the southwest quadrant of the <br />intersection. Early and frequent coordination with Xcel Energy will be necessary during the <br />design process. <br /> <br />3.6 Easements <br />Street improvements south of County Road E as proposed within this report are anticipated <br />to occur within the existing road right-of-way. Public utility improvements are planned to <br />occur within the right-of-way or currently dedicated drainage and utility easements. The <br />need for permanent easement acquisition south of County Road E is not expected to construct <br />the project as proposed. <br /> <br />Construction of a single lane roundabout at the intersection of County Road E and Snelling <br />Avenue North may require temporary and permanent easement acquisition in the southwest <br />quadrant of the intersection from the residential property at 3586 Ridgewood Road and <br />potentially the northeast quadrant at 3610 Snelling Avenue North. The intersection design <br />described in Section 3.4 will involve encroachments into the excess right -of-way green space <br />commonly referred to as Lindey’s Park in the southeast corner of the intersection. A portion <br />of this green space will also be needed for construction of a stormwater BMP to fulfill the <br />regulatory requirements of the Rice Creek Watershed District. <br /> <br />3.7 Permits/Approvals <br />The anticipated permits required for the proposed project are as follows: <br />▪ Minnesota Department of Health . . . . . . . . . . . . . . . Extension of Water Main <br />▪ Ramsey County . . . . . . . . . . . . . . . . . . . . . . . . . . . . Right-of-Way Permit <br />▪ Rice Creek Watershed District . . . . . . . . . . . . . . . . . Rule C Erosion Control, Linear Rule D <br />▪ Minnesota Pollution Control Agency . . . . . . . . . . . . Erosion and Stormwater Permit <br />▪ Minnesota Dept of Transportation. . . . . . . . . . . . . . . Right-of-Way and Drainage Permit <br /> <br />3.8 Construction Access and Staging <br />A traffic control and construction staging plan would be developed during preparation of <br />construction plans to coordinate property access and traffic safety within the project area. <br />The contractor will be responsible for providing access to all properties at th e end of each <br />work day, with the exception of concrete curing times during curb installation. Additional <br />information regarding staging and property access would be provided to residents prior to <br />and during the construction phase of the project. <br /> <br />