My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
04-12-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 2:52:22 PM
Creation date
4/8/2021 2:45:26 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report Page 24 <br />Snelling Avenue North and County Road E - Street and Utility Improvements <br />City Project Number PW 20-0100 <br />7. CONCLUSIONS AND RECOMMENDATIONS <br />Based on the findings of this report, the following street and utility improvements are <br />recommended for City Council consideration. <br /> <br />Street Improvements - Area 1 <br />Recommended street and utility improvements for Snelling Avenue North from County Road E <br />to Highway 51 consists of pavement improvements as previously described as Alternative 2 <br />within this report. The construction of a new pedestrian trail is not recommended at this time <br />due to the additional cost in relation to limited available capital funding and the Councils priority <br />to focus on trail construction north of County Road E to connect the City’s trail system to <br />Mounds View High School and eventually to the regional trail system at County Road 96. <br />Recommended improvements are summarized as follows. <br />▪ Full depth pavement reclamation and repaving the roadway to the existing section width from <br />County Road E to Highway 51 with widened west shoulder area and safety improvements as <br />outlined in Section 3. <br />▪ Reconstruction of Bussard Court from Snelling Avenue N to 100 feet west of Snelling <br />Avenue N to address failing pavement and subgrade deficiencies. <br />▪ Full depth pavement reclamation and repaving of Cummings Lane from Snelling Avenue to <br />east terminus. <br />▪ Replacement of water main between Lametti Lane and Bussard Court to improve reliability <br />of the water supply feed south of Cummings Lane. <br />▪ Replacement of the 8-inch diameter sanitary sewer crossing at Skiles Lane due to <br />deteriorated pipe conditions. <br /> <br />Intersection and Utility Improvements – Area 2 <br />Intersection improvements at Snelling Avenue North and County Road E are not recommended <br />to proceed to construction until completion of further investigation of projected traffic volume <br />growth for Bethel University and the surrounding roadway system. Ramsey County Public <br />Works representatives have indicated a willingness to conduct additional study of the <br />intersection and reschedule the intersection improvements within their Transportation <br />Improvement Program to the year 2023. During the interim planning period, City and County <br />staff should work collaboratively to address the following issues. <br />▪ Sanitary sewer repairs within the northeast quadrant of the intersection as described in <br />Section 3. <br />▪ Pipe lining and repairs to storm sewer located to the north and east of the intersection as <br />described in Section 3. <br />▪ Coordination of future intersection construction schedule with the proposed improvements <br />along Lexington Avenue between County Road E and I-694. <br /> <br />The total estimated cost for the proposed improvements to Snelling Avenue North as <br />recommended above is $1,242,600. Proposed funding for the project can be provided through a <br />combination of special assessments and City funds as outlined in Section 5 of this report.
The URL can be used to link to this page
Your browser does not support the video tag.