Laserfiche WebLink
!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />!(!( <br />!( <br />County E Rd <br />Cu <br />Cannon A <br />EB-1 * <br />EB-2 <br />EB-3 <br />EB-4 <br />EB-5 <br />EB-6 <br />EB-7 <br />EB-8 * <br />EB-9 <br />EB-10 <br />EB-11 <br />EB-12 * <br />EB-13 <br />EB-14 <br />SV-2 <br />SV-9 <br />!(Environmental Boring <br />!(Soil Vapor Boring <br />Project Corridor <br />0 525 <br />Feet¯Figure 3 - Analytical Exceedances <br />Field Investigation <br />Old Snelling Ave & CR E Improvements <br />Arden Hills, MN 1 inch = 525 feet <br />* = Groundwater sample collected <br />1,3-Butadiene 50 9.3 90 <br />1,3-Butadiene 38 9.3 90 <br />Naphthalene 10 28 4.5 <br />Benzo[a]pyrene 2 3 1.4 <br />Benzo[a]pyrene (BaP) Equivalent 2 23 1.4 <br />DRO 100* NE NE <br />Naphthalene NA 10 28 4.5 <br />Benzo[a]pyrene 2 3 1.4 <br />Benzo[a]pyrene (BaP) Equivalent 2 23 1.4 <br />DRO 100* NE NE