Laserfiche WebLink
OPINION OF PROBABLE COST - ALTERNATIVE NO. 1 <br />Feasibility Study <br />Snelling Avenue North - County Road E to Highway 51 <br />Arden HIlls, Minnesota <br />Project Number PW-21-0100 <br />Item No.Item Unit Unit Price Est. Quantity Total Price <br />1 MOBILIZATION LS -1 115,000.00$ <br />2 TRAFFIC CONTROL LS -1 25,000.00$ <br />SUBTOTAL - GENERAL AND REMOVALS 140,000.00$ <br />ENG. DESIGN, ADMIN, CONTINGENCY (37%)51,800.00$ <br />TOTAL - GENERAL AND REMOVALS 191,800.00$ <br />3 CLEARING ACRE $5,150.00 2.0 10,300.00$ <br />4 SAWING BITUMINOUS PAVEMENT LIN FT $4.00 700 2,800.00$ <br />5 REMOVE BITUMINOUS PAVEMENT SQ YD $3.00 27,300 81,900.00$ <br />6 REMOVE CONCRETE CURB & GUTTER LIN FT $3.50 848 2,968.00$ <br />7 COMMON EXCAVATION CU YD $20.00 10,300 206,000.00$ <br />8 SELECT GRANULAR BORROW CU YD $22.00 5,500 121,000.00$ <br />9 AGGREGATE BASE, CLASS 5 TON $18.00 4,170 75,060.00$ <br />10 BITUMINOUS MATERIAL FOR TACK COAT GAL $3.25 885 2,876.25$ <br />11 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TON $85.00 656 55,760.00$ <br />12 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B)TON $70.00 2,150 150,500.00$ <br />13 TYPE SP 12.5 NON-WEARING COURSE MIXTURE (2,B)TON $70.00 1,880 131,600.00$ <br />14 6-INCH CONCRETE WALK - PEDESTRIAN RAMP SQ FT $14.00 2,050 28,700.00$ <br />15 TRUNCATED DOME SQ FT $59.00 160 9,440.00$ <br />16 CONCRETE CURB & GUTTER, DESIGN B618 LIN FT $15.00 5,360 80,400.00$ <br />17 STRIPING & SIGNAGE LS -1 100,000.00$ <br />18 STABILIZED CONSTRUCTION ENTRANCE EACH $2,200.00 2 4,400.00$ <br />19 EROSION CONTROL AND RESTORATION LS -1 200,000.00$ <br />SUBTOTAL - STREET IMPROVEMENTS 1,263,704$ <br />ENG. DESIGN, ADMIN, CONTINGENCY (37%)467,571$ <br />TOTAL - STREET IMPROVEMENTS 1,731,275$ <br />20 REMOVE WATER MAIN LIN FT 7.00$ 3025.00 21,175.00$ <br />21 REMOVE WATER SERVICE PIPE LIN FT 5.00$ 75.00 375.00$ <br />22 REMOVE HYDRANT AND GATE VALVE ASSEMBLY EACH 480.00$ 6.00 2,880.00$ <br />23 REMOVE GATE VALVE & BOX EACH 175.00$ 16.00 2,800.00$ <br />24 REMOVE CURB STOP & BOX EACH 105.00$ 4.00 420.00$ <br />25 2-INCH RIGID INSULATION SQ YD 34.50$ 40.00 1,380.00$ <br />26 SPECIAL SOIL HANDLING FOR CONTAMINATION LS -$ 1.00 12,000.00$ <br />27 INSTALL HYDRANT, GATE VALVE AND 6-INCH DIP CL 52 ASSEMBLY EACH 5,900.00$ 7.00 41,300.00$ <br />28 1" CORPORATION STOP EACH 195.00$ 4.00 780.00$ <br />29 6" GATE VALVE & BOX EACH 2,150.00$ 3.00 6,450.00$ <br />30 8" GATE VALVE & BOX EACH 2,389.00$ 13.00 31,057.00$ <br />31 1" CURB STOP AND BOX EACH 400.00$ 4.00 1,600.00$ <br />32 CONNECT TO EXISTING WATERMAIN EACH 910.00$ 8.00 7,280.00$ <br />33 1" TYPE K COPPER PIPE LIN FT 40.00$ 75.00 3,000.00$ <br />34 DUCTILE IRON FITTINGS - EXPOXY COATED LBS 7.25$ 2170.00 15,732.50$ <br />35 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 50.00$ 2500.00 125,000.00$ <br />36 8" WATERMAIN DUCTILE IRON CL 52 LIN FT 57.00$ 525.00 29,925.00$ <br />SUBTOTAL - WATER SYSTEM 303,155$ <br />ENG. DESIGN, ADMIN, CONTINGENCY (37%)112,167$ <br />TOTAL - WATER SYSTEM 415,322$ <br />Snelling Avenue North <br />CR E to Hwy 51 <br />MOBILIZATION AND REMOVAL <br />STREET IMPROVEMENTS <br />WATER SYSTEM <br />Page 1 of 2