Laserfiche WebLink
EVENTGO21O-2000G'4 STATE OF MINNESOTA 20 of 20 <br />PRICING PAGE <br />Spec Description Qtyi Price Subtotal <br />w <br />wzs <br />For Prebuilu aiid Pilot meets See RFP special Terms and <br />conditions <br />14.27 <br />Pnobui|dspcwi-,Jonmeeting (per person) toboheld inSt. <br />PauNNinneapn,sanaa. <br />14.28 Pilot inspect, .00dng (per person). <br />15.0 TRAILER T^.. .r7l0NG: <br />15.1 Trailer tow p,:c,-ge extended to rear of frame 317.00 $ <br />15.2 Trail r pack,;je I-xtend to rear of frame per Spec 12.12 417.00 $ <br />15.3 Single 7 pin SAE type, end of frame 1 $117.00 $ 117.00 <br />15.4 <br />Dual 7 pins standard SAE type, end of frame (1)for trailer with <br />electric brakes, (1)for trailer with air brakes 158.00 $ <br />15.5 11-land control valve for trailer brakes 47.00 $ <br />16.0 MANUALS/TRADE-IN INTEREST FEE: <br />Percent interest per month (non+compounding) onunpaid cab & <br />1*.1 chassis balance. Applies only toCPV Members. (Payable after <br />trade-in iadelivered tovendor) Penoentage/parmonth. <br />mQanmos. <br />16.2 Manuals in pi/`' [oon, parts repair and nemioo. per set <br />16.3 Manuals in CJ onn. parts repair and aemioe, per set <br />16.4 Premium Tech Tool <br />1/.0 De|iveryCha,yos: <br />17.1 Phoo per loaded ni|o List starting point <br />17.2 Roseville, MN 55113 <br />18.0 Maintenance/Body Shop Repair Rate Per Hour <br />18.1 Rate for initial Inspection/Diagnostics <br />8.2 Rate for Mechanical Work <br />18.3 Rate for Body Work <br />1e.0 Quantity Discounts: <br />Enter the number ofunits that must bopurchased and the <br />corresponding discount percentage offered tothe purchaser. More <br />than one quantity discount may beentered. <br />19.1 Material surcharge <br />19.2 225Y62O2Omodel year increase <br />19.3 2021 model year increase <br />Total Cost: 108,963.00 <br />MAYOR DATE <br />AMENDMENT#1 FOR 2019 MODELS 3A