My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-21-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
04-19-21-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 3:08:17 PM
Creation date
4/15/2021 3:06:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />187184v1 17 <br />deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any <br />other right, power or remedy. <br /> L. The Developer will pay in full all invoices submitted to it by the City within sixty <br />(60) days after receipt which reasonably evidence those costs incurred in the drafting, enforcement and <br />supervision of this Agreement, including reasonable engineering, planning, and attorney's fees. If the <br />invoices are not paid on time, the City may halt all development work until the invoices are paid in full. <br />Invoices not paid within sixty (60) days shall be subject to an eight percent (8%) per annum interest <br />charge. <br /> M Developer shall be responsible for all snow removal from sidewalks on vacant <br />lots to the extent that City Ordinance requires snow removal from sidewalks on constructed homes. <br />Developer shall be responsible for ensuring that all vacant lots comply with the City’s Code regarding <br />nuisances. <br /> N Retaining walls that require a building permit shall be constructed in accordance <br />with plans and specifications prepared by a structural or geotechnical engineer licensed by the State of <br />Minnesota. Following construction, a certification signed by the design engineer shall be filed with the City <br />Engineer evidencing that the retaining wall was constructed in accordance with the approved plans and <br />specifications. All retaining walls the development plans, or special conditions referred to in this Agreement <br />required to be constructed shall be constructed before any Certificate of Occupancy is issued for a lot on <br />which a retaining wall is required to be built. <br /> 35. SUCCESSORS AND ASSIGNS. The Developer may not assign this Agreement <br />without the written permission of the City Council. This Development Contract shall be binding upon and <br />inure to the benefit of the parties and their respected successors and assigns, including without limitation, <br />any and all future and present owners, tenants, occupants, licensee, mortgagee and any other parties with <br />any interest in the Property. Should the Developer convey any lot or lots in the Plat to a third party, the <br />city and the owner of that lot or those lots may amend the Development or this Development Contract,
The URL can be used to link to this page
Your browser does not support the video tag.