My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-002
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
2020-2029
>
2021
>
2021-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 9:29:00 AM
Creation date
4/27/2021 9:28:51 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Effective 1/1/2020 <br />ELECTRICAL PERMIT FEES Exhibit “A” <br />HOMEOWNERS AND ELECTRICAL CONTRACTORS: Complete an electrical permit form available from the Building <br />Inspections Division. Add $1.00 for State surcharge to total cost of each permit. The fee is the total of the listed fees or the total number <br />of inspection trips x $45.00, whichever is greater. <br />Residential panel replacement is $110.00, sub <br />panel $45.00. New service or power supply is: Circuits and Feeders <br />0 to 300 Amp $55.00 0-100 Amp $9.00 <br />400 Amp $71.00 101-200Amp $15.00 <br />500 Amp $87.00 201-300 Amp $21.00 <br />600 Amp $103.00 301-400 Amp $27.00 <br />800 Amp $135.00 401-500 Amp $33.00 <br />1000 Amp $167.00 501-600 Amp $39.00 <br />Add $16.00 for each additional 100 amps Add $6.00 for each additional 100 amps <br />Minimum Fee: Maximum Fee: <br />Minimum permit fee is $45.00 plus $1.00 Maximum fee for single family dwelling or <br />State surcharge. This is for one inspection townhouse not over 200 amps (No max if <br />only. Minimum fee for rough-in and final service is over 200Amps) is $190.00 plus <br />inspection is $90.00 plus $1.00 State surcharge. $1.00 State surcharge. Maximum of 2 rough-in’s and 1 final <br />inspection. (Failed inspections are an additional $45.00 each) <br />Apartment Buildings <br />Fee per unit of an apartment or condominium complex is $80.00. <br />This does not cover service, unit feeders or house panels. <br />Swimming Pools and Hot Tubs $90.00 plus circuits at $9.00/each. This includes 2 inspections. <br />Additions, Remodels or <br />Basement Finishes $90.00 this include up to 10 circuits and 2 inspections <br />Residential Accessory Structures The Greater of $55.00 for panel plus $9.00 per circuit or $90 for 2 <br />inspections. <br />Traffic Signals $8.00 per each standard <br />Street and Parking Lot Lights $5.00 per each standard <br />Transformers and Generators $5 up to 10kva, $40 11 to 74kva, $60 75kva to 299kva, over 299kva is <br />$165 <br />Retrofit Lighting $0.85 cents per fixture <br />Sign Transformer or Driver $9.00 per transformer <br />Low voltage fire alarm, low voltage heating $0.85 cents per device <br />and air conditioning control wiring <br />Re-Inspection Fee in addition $45.00 <br />to all other fees <br />Hourly rate for carnivals $90.00 <br />Solar fees: <br />0kw to 5kw = $90 5.1kw to 10kw = $150 <br />10.1kw to 20kw = $225 20.1kw to 30kw = $300 <br />30.1kw to 40kw = $375 40.1kw and larger is $375 plus $25 for each additional 10kw <br />Electronic inspection fee for these items only; furnace, air conditioning, bath fan, fireplace or receptacle for water <br />heater vent is $40. <br />Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities 20% handling fee. <br />THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED. <br />Page 14 of 14
The URL can be used to link to this page
Your browser does not support the video tag.