My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2021
>
04-12-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:28:53 PM
Creation date
4/29/2021 12:08:14 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—APRIL 12, 2021 6 <br /> MOTION: Councilmember Holden moved and Councilmember Holmes seconded a <br /> motion to adopt Resolution No. #2021-020 Adopting the Assessment Roll for <br /> the 2021 PMP Street and Utility Improvement Project. A roll call vote was <br /> taken. The motion carried (5-0). <br /> B. Resolution 2021-021 Accepting Bid and Authorizing Award of Contract to C <br /> & L Excavating, Inc.—2021 PMP Street and Utility Improvement Project <br /> Nick Amatuccio, Bolton & Menk, stated on January 25, 2021, the City Council adopted <br /> Resolution 2021-004 Approving the Plans and Specifications and Ordering the Advertisement for <br /> Bids. Bids were opened on Wednesday, February 24, 2021. There were a total of eleven bids <br /> received. The bids were reviewed with the Council. It was noted the low bid is lower than the <br /> Engineer's Estimate which is $3,234,599.50. C&L Excavating has completed similar projects <br /> successfully in the metro area. Staff reviewed a letter from Bolton & Menk recommending award <br /> to C&L Excavating, Inc. as the lowest responsible/responsive bidder. Staff recommended <br /> approval of Resolution 2021-021 awarding the 2021 PMP Street and Utility Improvements to <br /> C&L Excavating, Inc. in the amount of$2,704,412.10. <br /> Mayor Grant asked if Mr. Amatuccio has any experience working with C&L Excavating. <br /> Mr. Amatuccio stated he did not have any personal experience, but noted Bolton & Menk has <br /> successfully worked with this company in St. Louis Park, Zimmerman and Annandale. He <br /> indicated he has only heard good things about this company. <br /> Councilmember Holden encouraged staff to watch over the type of soil that was used to fill in <br /> and complete the City right of way. She wanted to see good pulverized black dirt brought in. <br /> Mr. Amatuccio reported materials testing would be completed to make sure the organic content <br /> within the soil was being met for this work in order to allow for the growth of sod. <br /> Councilmember Holmes stated this was a big complaint in her neighborhood. She noted the soil <br /> that was used was terrible. <br /> MOTION: Councilmember Holden moved and Councilmember Holmes seconded a <br /> motion to adopt Resolution No. #2021-021 Awarding the 2021 PMP Street and <br /> Utility Improvements to C&L Excavating, Inc. in the amount of <br /> $2,704,412.10. <br /> Councilmember Holmes asked if the City had moved from seeding to sod for the boulevard <br /> areas. <br /> Interim Public Works Director Swearingen stated during the design phase different options <br /> were considered for boulevard restoration and it was found to be within the budget to upgrade to <br /> sod replacement. <br /> A roll call vote was taken. The motion carried (5-0). <br />
The URL can be used to link to this page
Your browser does not support the video tag.