My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-05-21 Planning Commission
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2021
>
05-05-21 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:57:38 PM
Creation date
4/29/2021 3:55:00 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 Revised 10/03/2019 Ordinance Language Commentary Figure 5. Shore Impact Zone 2.550 Shoreland. “Shoreland” means land located within the following distances from public waters: A. 1,000 feet from the ordinary high water level of a lake, pond, or flowage; and B. 300 feet from a river or stream, or the landward extent of a floodplain designated by ordinance on a river or stream, whichever is greater (see Figure 6). Figure 6. Definition of Shoreland 2.551 Shore recreation facilities. Swimming areas, docks, watercraft mooring areas and launching ramps and other water recreation facilities.
The URL can be used to link to this page
Your browser does not support the video tag.