Laserfiche WebLink
<br />_____________________________________________________________________________________________ <br />City of Arden Hills <br />Planning Commission Meeting for May 5, 2021 <br />P:\Planning\Planning Cases\2021\21-011 - Chick-Fil-A CUP. Master Plan PUD, Final PUD\PC Packets <br />Page 11 of 12 <br />6. The Applicant shall be financially responsible for all applicable water and sanitary <br />charges. Rates applied shall be those in effect at the time of Final Plat approval and <br />shall be memorialized in the Development Agreement. <br />7. A right-of-way permit shall be required for work performed within the City right-of- <br />way. <br />8. No exterior storage shall be permitted. <br />9. Prior to the issuance of a land disturbance permit, the Applicant shall submit an <br />operation and maintenance plan for the long-term care of all on-site and off-site <br />stormwater, sanitary sewer, and water main to the City for review and approval. The <br />Applicant will be responsible to carry out these operation and maintenance activities <br />and to submit the appropriate documentation to the City as specified. <br />10. Any future trash enclosures shall utilize wooden gates and be constructed on three <br />sides using the same materials and patterns used on the building. Locations shall be <br />approved by the Planning Department. <br />11. Prior to the issuance of a building permit, a landscape financial security in the amount <br />of 125% of the estimated cost of the landscaping shall be submitted. Landscape <br />financial security is held for two full growing seasons. <br />12. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br />preserved shall be visibly marked and city-approved tree protection fencing or other <br />method shall be installed and maintained at the critical root zones of the trees to be <br />protected. The location of the fencing shall be in conformance with the approved tree <br />preservation plan and approved by staff in writing. <br />13. All rooftop or ground mounted mechanical equipment shall be hidden from view with <br />the same materials used on the building in accordance with City Code requirements. <br />14. All fencing and retaining wall materials shall be complementary to the building <br />materials and shall be approved in writing by the Planning Division prior to issuance <br />of a building permit. Retaining walls greater than four (4) feet in height shall be <br />engineered and detailed calculations shall be submitted to the City. <br />15. Prior to City Council, the Applicant shall submit a materials board to be approved in <br />writing by staff. <br />16. A Grading and Erosion permit shall be obtained from the city’s Engineering Division <br />prior to commencing any grading, land disturbance or utility activities. The <br />Developer shall be responsible for obtaining any permits necessary from other <br />agencies, including but not limited to, MPCA, Rice Creek Watershed District, and <br />Ramsey County, MNDOT prior to the start of any site activities. <br />17. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and <br />all stormwater runoff, sediments and debris during all construction activities. <br />Temporary stormwater facilities shall be installed to protect the quality aspect of the <br />proposed and existing stormwater facilities prior to and during construction activities. <br />Maintenance of any and all temporary stormwater facilities shall be the responsibility <br />of the Applicant. <br />18. Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br />review and approve final grading and utility plans in writing. <br /> <br />2. Recommend Approval without Conditions: Motion to recommend approval of Planning Case <br />21-011 for a Master Plan Planned Unit Development, a Final Planned Unit Development, and