My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-05-21 Planning Commission
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2021
>
05-05-21 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:57:38 PM
Creation date
4/29/2021 3:55:00 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – April 7, 2021 2 <br />south side of Building 14, in the northwest corner of the Arden Hills campus near Innovation <br />Way. The purpose of this facility is the development and production of lithium batteries for use <br />in medical devices. The primary space in the facility is a ‘dry room,’ a space maintained at less <br />than 1% relative humidity, which is required for handling lithium. Ancillary functions in the <br />addition include office and conference space. <br />Planning Consultant Kansier explained the Boston Scientific campus at 4100 Hamline Avenue <br />North operates under a Planned Unit Development (PUD) that was originally approved in 2002 <br />for the Guidant Corporation. The last update to the PUD and Campus Master Plan took place in <br />2020 when the City approved a loading dock addition to the South side of Building 10. Before <br />that, in 2017, the City approved a 5,330 square foot building addition on the northeast corner of <br />Building 9 (Planning Case 17-013). New building construction or site modification identified on <br />the approved Campus Master Plan requires the submittal of a Site Plan Review application prior <br />to construction. For building construction or site modifications not included on the Master Plan, <br />a PUD Amendment is required. The proposed addition to Building 14 is not shown on the current <br />Master Plan and a PUD Amendment is therefore being requested. <br />Planning Consultant Kansier reviewed the surrounding area, the Plan Evaluation and provided <br />the Findings of Fact for review: <br />1.The Boston Scientific campus at 4100 Hamline Avenue North operates under a Planned <br />Unit Development (PUD) that was originally approved in 2002 for the Guidant <br />Corporation. <br />2.The last update to the PUD and Campus Master Plan took place in in 2020 when the City <br />approved a loading dock addition to the South side of Building 10 (Planning Case 19- <br />018). <br />3.New building construction or site modification identified on the approved Campus <br />Master Plan requires the submittal of a Site Plan Review application prior to construction. <br />4.For building construction or site modifications not included on the Master Plan, a PUD <br />Amendment is required. <br />5. The proposed addition to Building 14 is not shown on the current Master Plan. <br />6.A public hearing for a PUD Amendment request is required before the request can be <br />brought before the City Council. <br />7.The Planning Commission conducted a public hearing on April 7, 2021. <br />Planning Consultant Kansier recommended approval of the Planning Case for a PUD <br />Amendment and Site Plan Review of 4100 Hamline Avenue, based on the findings of fact and <br />the submitted plans, as amended by the conditions in the April 7, 2021 Report to the Planning <br />Commission: <br />1.All conditions of the original Planned Unit Development shall remain in full force and <br />effect. <br />2.Prior to the issuance of a grading permit, all items identified in the February 17, 2021 <br />Engineering Division memo shall be addressed. All comments shall be adopted herein by <br />reference. <br />3.The project shall be completed in accordance with the plans submitted as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City
The URL can be used to link to this page
Your browser does not support the video tag.