Laserfiche WebLink
<br /> David Swearingen <br />March 4, 2021 <br /> <br /> <br /> 3 <br />34. Show construction entrance use will not encroach off property. <br />L1.0 - LANDSCAPE PLAN <br />35. Scale missing units <br />36. Water quality volume and details are not shown on plans. <br />C2.1 - DETAILS <br />37. 3/C2.1 – What is wood stake dimension? <br />38. 4/C2.1 number used twice. <br />39. 4/C2.1 PIPE BEDDING – No pipe wrap for perforated pipe? <br />40. 9/C2.1 – How will detailed wrap drain tile into san subbase be constructed? <br />41. 10/C2.1 – How will detailed wrap drain tile into san subbase be constructed? <br />42. 11/C2.1 – How will detailed wrap drain tile into san subbase be constructed? <br />43. Missing detail callout numbers in several details <br />44. Detail watermain offset information. No watermains are shown on utility plans. <br />STORM WATER MANAGEMENT REPORT <br />45. Confirm 2, 10 and 100 event runoff is per checklist and are ATLAS 14. <br /> <br />Thank you for the opportunity to perform the engineering review on the Athletic Improvements Bethel University <br />plans. If you have any questions, or need any additional information, please contact John Morast at <br />jmorast@hrgreen.com or 763.710.1514. <br /> <br />Sincerely, <br /> <br /> <br /> <br />HR GREEN, INC <br />John W. Morast, PE <br />Regional Director <br /> <br /> <br />Construction entrance shown on property. <br />Added units to legend. <br />1-1/2" x 18" min. Added to detail. <br />Re-Numbered all details. <br />Trench subbase, lay geotextile <br />fabric, pour pearock in, wrap <br />rock with fabric, pour in sand. <br />Re-Numbered all details / callouts. <br />Removed watermain detail. <br />New detail. Non-perforated pipe. <br />Refer to sheet C1.5 & C1.51. <br />Event runoffs are per checklist and are <br />ATLAS 14.