Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – April 7, 2021 2 <br />south side of Building 14, in the northwest corner of the Arden Hills campus near Innovation <br />Way. The purpose of this facility is the development and production of lithium batteries for use <br />in medical devices. The primary space in the facility is a ‘dry room,’ a space maintained at less <br />than 1% relative humidity, which is required for handling lithium. Ancillary functions in the <br />addition include office and conference space. <br />Planning Consultant Kansier explained the Boston Scientific campus at 4100 Hamline Avenue <br />North operates under a Planned Unit Development (PUD) that was originally approved in 2002 <br />for the Guidant Corporation. The last update to the PUD and Campus Master Plan took place in <br />2020 when the City approved a loading dock addition to the South side of Building 10. Before <br />that, in 2017, the City approved a 5,330 square foot building addition on the northeast corner of <br />Building 9 (Planning Case 17-013). New building construction or site modification identified on <br />the approved Campus Master Plan requires the submittal of a Site Plan Review application prior <br />to construction. For building construction or site modifications not included on the Master Plan, <br />a PUD Amendment is required. The proposed addition to Building 14 is not shown on the current <br />Master Plan and a PUD Amendment is therefore being requested. <br />Planning Consultant Kansier reviewed the surrounding area, the Plan Evaluation and provided <br />the Findings of Fact for review: <br />1.The Boston Scientific campus at 4100 Hamline Avenue North operates under a Planned <br />Unit Development (PUD) that was originally approved in 2002 for the Guidant <br />Corporation. <br />2.The last update to the PUD and Campus Master Plan took place in in 2020 when the City <br />approved a loading dock addition to the South side of Building 10 (Planning Case 19- <br />018). <br />3.New building construction or site modification identified on the approved Campus <br />Master Plan requires the submittal of a Site Plan Review application prior to construction. <br />4.For building construction or site modifications not included on the Master Plan, a PUD <br />Amendment is required. <br />5. The proposed addition to Building 14 is not shown on the current Master Plan. <br />6.A public hearing for a PUD Amendment request is required before the request can be <br />brought before the City Council. <br />7.The Planning Commission conducted a public hearing on April 7, 2021. <br />Planning Consultant Kansier recommended approval of the Planning Case for a PUD <br />Amendment and Site Plan Review of 4100 Hamline Avenue, based on the findings of fact and <br />the submitted plans, as amended by the conditions in the April 7, 2021 Report to the Planning <br />Commission: <br />1.All conditions of the original Planned Unit Development shall remain in full force and <br />effect. <br />2.Prior to the issuance of a grading permit, all items identified in the February 17, 2021 <br />Engineering Division memo shall be addressed. All comments shall be adopted herein by <br />reference. <br />3.The project shall be completed in accordance with the plans submitted as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City