Laserfiche WebLink
ARDEN HILLS CITY COUNCIL – APRIL 26, 2021 14 <br /> <br />motion to approve Planning Case 21-001, for a PUD Amendment and Site Plan Review of 4100 <br />Hamline Avenue based on the findings of fact and submitted plans, subject to the following <br />conditions: <br /> <br />1. All conditions of the original Planned Unit Development shall remain in full force and <br />effect. <br />2. Prior to the issuance of a grading permit, all items identified in the February 17, 2021 <br />Engineering Division memo shall be addressed. All comments shall be adopted herein by <br />reference. <br />3. The project shall be completed in accordance with the plans submitted as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City <br />Planner, shall require review and approval by the Planning Commission and City Council. <br />4. The proposed structures shall conform to all other regulations in the City Code. <br />5. A Grading and Erosion permit shall be obtained from the city’s Engineering Division prior <br />to commencing any grading, land disturbance or utility activities. The Applicant shall be <br />responsible for obtaining any permits necessary from other agencies, including but not <br />limited to, MPCA, Rice Creek Watershed District, and Ramsey County prior to the start of <br />any site activities. <br />6. Heavy duty silt fence and adequate erosion control around the entire construction site shall <br />be required and maintained by the Developer during construction to ensure that sediment <br />and storm water does not leave the project site. <br />7. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. <br />8. Prior to the issuance of a building permit, a landscape financial security equal to 125% of <br />the cost of the landscaping to be installed on the site shall be submitted. The Applicant <br />must submit a detailed cost estimate for the landscaping so staff can determine the final <br />amount. Landscape financial security shall be held for two full growing seasons. <br />9. Prior to the issuance of a building permit, the Applicant shall submit a materials board to <br />be approved in writing by staff. <br />10. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br />shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br />lenses. Other than wash or architectural lighting, attached security lighting shall be <br />shoebox style, downward directed with flush lenses. In addition, any lighting under <br />canopies (building entries) shall be recessed and use a flush lens. The applicant must <br />provide photometric calculations for the lighting at the west property line. <br />11. Once construction is complete and the equipment is operational, the Applicant must <br />conduct a noise study to ensure the facility does not exceed maximum noise standards. If <br />necessary, steps shall be taken to correct any deficiencies. <br />12. Boston Scientific to complete yearly noise studies on Building 14 and to report these <br />findings to the City of Arden Hills. <br /> <br />Planning Consultant Kansier reviewed the options available to the City Council on this matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted <br />3. Recommend Denial <br />4. Table