My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-10-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
05-10-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 3:56:15 PM
Creation date
5/6/2021 3:54:41 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional Services Agreement <br />Hamline Avenue and Shorewood Drive Improvement Project <br />Job Number: 181582 <br />5/3/2021 <br />Page 2 of 10 <br /> <br />Version2.3 5.3.2021 <br /> <br /> <br />THIS AGREEMENT is between (City of Arden Hills) (hereafter “CLIENT”) and HR GREEN, INC. <br />(hereafter "COMPANY"). <br /> <br />1.0 Project Understanding <br />1.1 General Understanding <br />HR Green will provide Construction Engineering Service for the construction of the <br />Hamline Avenue Crosswalk and Shorewood Drive Improvement Project. <br /> <br />2.0 Scope of Services <br />The CLIENT agrees to employ COMPANY to perform the following services: <br /> <br />HR Green will provide Construction Observation Services on a time and material, not-to- <br />exceed contract amount basis. The hours provided for construction observation are based <br />upon a contractor working schedule of 60 working days. HR Green assumes providing <br />construction observation services for 6 hours per day for 10 working days for the Hamline <br />Ave project and 6 hours per day for 8 working days for Shorewood Dr. Any additional work <br />due to an extended schedule dictated by the contractor’s performance or unanticipated work <br />due to site conditions shall warrant a contract addendum. <br /> <br />The following is a breakdown of the various tasks associated with the construction <br />observation which will be completed by HR Green, Inc.: <br /> <br /> <br />A. Start Up <br /> <br />HR Green will complete a preconstruction photos of the proposed construction <br />area to document the existing conditions prior to the start of construction. <br /> <br />HR Green will ensure that the project details, construction timelines and any <br />impacts that the project may create will be coordinated with the Client prior to the <br />start of construction. <br /> <br />HR Green will mark, measure and document contract removal payment items prior <br />to the contractor starting work. <br /> <br />The effort for marking removal extents for Hamline Avenue Crosswalk was <br />included in the previous design contract and will be performed by Surveyor. HR <br />Green anticipates Surveyor will be onsite for Shorewood Drive Improvements <br />Project for approximately twenty (4) hours to complete the above noted <br />coordination and construction preparation. A total of six (6) hours have been <br />allotted to complete the project start up (2 hours for photos and 4 hours for removal <br />markings at Shorewood Dr.) <br /> <br />.
The URL can be used to link to this page
Your browser does not support the video tag.