Laserfiche WebLink
Professional Services Agreement <br />Hamline Avenue and Shorewood Drive Improvement Project <br />Job Number: 181582 <br />5/3/2021 <br />Page 4 of 10 <br /> <br />Version2.3 5.3.2021 <br />preparation of final job records, completion of punchlist, final payment estimate <br />and final change order. <br /> <br /> <br />F. Material Testing <br /> <br />Braun Engineering will provide the Quality Assurance Material Testing Services <br />for this project. Quality Assurance testing for asphalt and concrete shall be <br />completed in accordance with MnDOT State Aid requirements. This task includes <br />six (6) hours has been allotted for coordinating with MnDOT Metro Inspection, the <br />contractor, and Braun for testing. <br /> <br /> <br />Disclaimer <br /> <br />HR Green shall not supervise, direct or have any control over the contractor’s work. HR <br />Green shall not have any responsibility for the construction means, methods, techniques, <br />sequences or procedures selected by the contractor. Also, HR Green is not responsible <br />for the contractor’s safety precautions or programs in connection with this work. These <br />rights and responsibilities are solely those of the contractor. <br /> <br />HR Green shall not be responsible for any acts or omissions of the contractor, subcontractor <br />or any entity performing any portion or the work, or any agents or employees of any of them. <br />HR Green does not guarantee the performance of the contractor and shall not be <br />responsible for the contractor’s failure to perform its work in accordance with the contract <br />drawings and documents. <br /> <br />HR Green shall be responsible to notify the Client representative of any observed <br />construction contract failures to perform the work in accordance with contract drawings and <br />documents, commensurate with HR Green’s knowledge as an engineering professional. <br /> <br /> <br />3.0 Items not included in Agreement/Supplemental Services <br />The following items are not included as part of this AGREEMENT: <br /> <br />o Construction Layout <br />o As -Built Construction Survey <br /> <br />Supplemental services not included in the AGREEMENT can be provided by COMPANY <br />under separate agreement, if desired. <br /> <br />4.0 Services by Others <br />Quality Assurance Material Testing to be provided by Braun Engineering under this <br />contract. <br /> <br />