My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-26-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2021
>
04-26-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 8:49:15 AM
Creation date
5/12/2021 8:48:37 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL – APRIL 26, 2021 19 <br /> <br /> <br />5. Bethel University has requested Site Plan Review approval for the proposed changes to <br />the football and practice fields. <br />6. The proposed changes to the football and practice fields would be in compliance with all <br />provisions of the Zoning Code. <br />7. A public hearing for a PUD Amendment request is required before the request can be <br />brought before the City Council. <br />8. The Planning Commission conducted a public hearing on April 7, 2021. <br /> <br />Conditional Use Permit Evaluation Findings: <br />9. The proposed plan is not anticipated to have any impact on traffic or parking conditions <br />because the additions do not include an increase in football field seating. <br />10. The proposed plan includes the addition of LED lights and will increase illumination <br />around the football fields. <br />11. The proposed plan will not produce any permanent noise, odors, vibration, smoke, dust, <br />air pollution, heat, liquid, or solid waste, and other nuisance characteristics. <br />12. The proposed plan will impact drainage on the site. <br />13. The proposed plan will not impact population density. <br />14. The proposed plan is not expected to have a visual impact on surrounding properties or on <br />land use compatibility with uses and structures on surrounding land or adjoining land <br />values because the new additions will not be easily visible from outside the Bethel <br />University campus. <br />15. Park dedication requirements are not applicable. <br />16. The proposed plan does not conflict with the general purpose and intent of the Zoning <br />Code or the Comprehensive Development Plan for the City. <br /> <br />Planning Consultant Kansier explained the Planning Commission reviewed this application at <br />their April 7, 2021 meeting. At that time, they recommended approval of the Bethel University <br />application for a Conditional Use Permit Amendment and Site Plan by a 6-0 vote. Staff <br />recommended adopting of Resolution 2021-026 approving the Conditional Use Permit and Site <br />Plan Review for Planning Case 21-002 at 3900 Bethel Drive, based on the findings of fact and the <br />submitted plans, subject to the following conditions: <br /> <br />1. All conditions of the original Conditional Use Permit shall remain in full force and effect. <br />2. Prior to the issuance of a grading permit, all items identified in the March 11, 2021 <br />Engineering Division memo shall be addressed. All comments shall be adopted herein by <br />reference. <br />3. The project shall be completed in accordance with the plans submitted as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City <br />Planner, shall require review and approval by the Planning Commission and City Council. <br />4. The proposed structures shall conform to all other regulations in the City Code. <br />5. A Grading and Erosion permit shall be obtained from the city’s Engineering Division <br />prior to commencing any grading, land disturbance or utility activities. The Applicant <br />shall be responsible for obtaining any permits necessary from other agencies, including <br />but not limited to, MPCA, Rice Creek Watershed District, and Ramsey County prior to the <br />start of any site activities. <br />6. Heavy duty silt fence and adequate erosion control around the entire construction site shall <br />be required and maintained by the Developer during construction to ensure that sediment <br />and storm water does not leave the project site.
The URL can be used to link to this page
Your browser does not support the video tag.