My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
05-24-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2021 4:18:02 PM
Creation date
5/21/2021 4:07:49 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
693
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />215196v1 <br />Arden Hills campus near Innovation Way (the “Project”). As stated in the application and <br />project narrative submitted by Boston Scientific, the purpose of the Project is for the <br />development and production of lithium batteries for use in medical devices. The primary space <br />in the facility is a ‘dry room’, a space maintained at less than one (1%) percent relative humidity, <br />which is required for handling lithium. <br /> <br /> E. For building construction or site modifications not included on the approved <br />Master Plan, an Amendment to the Planned Unit Development Agreement is required. The <br />proposed Project is not identified on the approved Campus Master Plan. <br /> <br />3. PLANNING COMMISSION REVIEW. On April 7, 2021, the City Planning <br />Commission reviewed the application at a public hearing and after considering the application, <br />the reports and comments of the City’s staff, the reports and comments of Boston Scientific, and <br />other public comments, and subject to conditions, recommended approval of the 16th <br />Amendment to the Master Planned Unit Development Agreement. <br /> <br />4. CITY COUNCIL REVIEW. On April 26, 2021, the City Council reviewed the <br />application, the reports and recommendations of City’s staff, the reports of Boston Scientific, the <br />recommendations of the City Planning Commission, additional testimony from nearby residents, <br />and has approved the 16th Amendment to Master Planned Unit Development Agreement, all <br />subject to the terms and conditions herein contained. <br /> <br />5. TERMS AND CONDITIONS. <br /> <br />1. All conditions of the original Planned Unit Development shall remain in full force <br />and effect. <br /> <br />2. Prior to the City’s issuance of a grading permit, Developer shall address all items <br />identified in the February 17, 2021 Engineering Division memorandum and all comments shall <br />be adopted herein by reference. <br /> <br />3. The Project shall be completed in accordance with the plans submitted or as <br />referenced at the City Council meeting of April 26, 2021 as amended by the conditions of <br />approval, including the planting of new or relocated evergreen trees to serve as additional buffer <br />from the existing building and addition and neighboring residential properties . Any significant <br />changes to these plans, as determined by the City Planner, shall require review and approval by <br />the Planning Commission and City Council. <br /> <br />4. Applicant shall conform all proposed structures to all applicable regulations in the <br />City Code. <br /> <br />5. Applicant shall obtain from the City’s Engineering Division the grading and <br />erosion permit prior to commencing any grading, land disturbance or utility activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.