My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
05-24-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2021 4:18:02 PM
Creation date
5/21/2021 4:07:49 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
693
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Proposed BMP <br />Description Location Pretreatment Volume <br />provided <br />EOF <br />Biofiltration <br />Basin 20 <br />Western <br />Property Line <br />Sump and grassy <br />swales <br />5,357± cubic <br />feet below the <br />outlet <br />907± <br />(verify of <br />final plans) <br /> <br />2. The Permittee will: <br /> <br />a. Obtain certified as-built contours for all ponds and inspect the ponds, and <br />associated outlet structures, culverts and outfall structures one year and two <br />years after the completion of as-builts, including measuring sediment <br />accumulation by a method accurate to within one vertical foot. Thereafter, the <br />Permittee will perform inspections in the fifth year after pond completion and <br />every five years thereafter. If inspections show that sediment may accumulate <br />to 50 percent of wet storage volume, or 25 percent of dry detention volume, <br />within less than five years, the Permittee will inspect more frequently. Pond <br />function will be considered inadequate if sediment accumulation has decreased <br />the wet storage volume by 50 percent or dry detention volume by 25 percent, <br />and the Permittee will restore the basin to its original design elevations and <br />dimensions and restore vegetation in disturbed areas within one year of the <br />inspection date. <br /> <br />b. Inspect stormwater infiltration and filtration basins, including rain gardens, <br />annually, to preserve live storage capacity at or above the design volume. <br />Remove vegetation, maintain healthy plant growth and remove excess sediment <br />and debris to ensure that the facilities continue to perform per design. <br /> <br />c. Inspect grit chambers, sump catch basins and sump manholes annually. <br />Accumulated sediment and debris will be removed so that the each facility <br />continues to operate as designed and erosion or structural problems are <br />corrected. <br /> <br />d. Inspect conveyances and other structures annually. Ensure preservation of <br />designed hydraulic capacity. <br /> <br />3. If the Permittee conveys into private ownership a fee interest in all or any portion of <br />the public property that is subject to this Agreement, it must require as a condition of
The URL can be used to link to this page
Your browser does not support the video tag.