My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
05-24-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2021 4:18:02 PM
Creation date
5/21/2021 4:07:49 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
693
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Study <br />•Traffic study completed in March, 2021 <br />•Summary: <br />•The proposed development is expected to generate approximately 200 a.m. peak hour, 163 <br />p.m. peak hour, and 2,352 daily site trips. <br />•Results of the year 2023 build operations analysis indicate that all intersections are expected <br />to operate at a LOS C or better during peak hours. <br />•With the Lexington Avenue reconstruction project, the Lexington Avenue/Red Fox Road <br />intersection is expected to continue to operate at a LOS C during the p.m. peak hour. <br />•The report concludes the proposed development would not result in significant degradation <br />in peak period traffic operations and level of service. <br />20
The URL can be used to link to this page
Your browser does not support the video tag.