My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
06-28-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 4:28:13 PM
Creation date
6/24/2021 4:06:57 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION – MAY 17, 2021 14 <br /> <br />Finance Director Bauman replied that because it was intermittent they may or may not have <br />caught it when they were running the report. There is a possibility they may have gotten a <br />notification if we had been receiving the readings. <br /> <br />Councilmember Holden suggested they split 50/50 on anything above the normal average. <br /> <br />Councilmember Holmes agreed. <br /> <br />Councilmember Scott said he wasn’t ready to make a decision. <br /> <br />Councilmember McClung agreed to 50/50 on anything above the normal average. <br /> <br />G. MnDOT Highway 51 Speed Sign <br /> <br />After discussion, Council was in support of a sign, prioritizing the southbound lane first. Staff <br />was directed to work with MnDOT for a southbound sign, and a northbound sign would be <br />discussed at a future meeting. <br /> <br /> <br />H. Met Council Regional Bicycle Transportation Network (RBTN) Trail Corridor <br />Realignment <br /> <br />Interim Public Works Director Swearingen said the City of Roseville contacted Arden Hills <br />staff with the proposed change in alignment for the Regional Bicycle Transportation Network <br />(RBTN). Attachment A showed the existing alignment and the surrounding pink area is the <br />corridor in which funding from the Met Council will be considered. The shift takes the alignment <br />to the west off Lydia and continues north connecting Old Snelling/Highway 51. With this shift, <br />the corridor would then cover Highway 51 from Lydia to Roseville’s border. Roseville has a <br />proposed route along this segment which would connect to a proposed trail in Arden Hills, <br />Glenhill up to Old Snelling. A letter of support does not commit the City construction of a trail, <br />but the alignment shift opens up additional sources of funding for Roseville. There is no current <br />time frame for construction of the trail but MnDOT indicated they would be repaving Hwy 51 in <br />2026. Roseville will be submitting the application to Met Council for the proposed alignment <br />shift and has asked Arden Hills for a letter of support. <br /> <br />Mayor Grant noted that the Arden Hills section is already in the RBTN. Roseville wants to <br />adjust the boundaries so they can make the segment along Lydia part of the RBTN trail. If we <br />send a letter of support they may or may not build a trail, but it doesn’t affect our portion of the <br />trail. <br /> <br />Councilmember McClung gave his support, but residents think this is happening in a year or two <br />so communications needs to be made that this isn’t a current project. <br />Interim Public Works Director Swearingen noted that a trail could be built anywhere within the <br />buffer zone and receive funding. <br /> <br />Councilmember Holden said she was for this but wondered if there was land in the buffer zone <br />that wasn’t owned by private residents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.