Feasibility Report TKDA Project No. 18196.000 <br />City of Arden Hills Page 13 <br /> <br />With a total estimated bond issue of $525,407 for full depth reclamation (option 1), the assessed <br />amount of $262,400 would be equivalent to 50% of the total bond issue. For the mill and overlay <br />(option 2), the bond issue would be $354,599 and assessments of $177,000 would also be <br />equivalent to 50% of the total bond issue. <br /> <br />Minnesota Statutes Chapter 429 Special Assessment Bond Issue requires that a minimum of 20% <br />of the total bond issue amount be recovered through special assessments. <br /> <br />Preliminary Project Schedule: <br /> <br />Table 5 outlines a project schedule to substantially complete the assessable project in 2022: <br /> <br />Table 5: Preliminary Project Schedule <br />Activity Date <br />Authorize Preparation of Feasibility Report April 26, 2021 <br />City Council Work Session July, 19, 2021 <br />Accept Feasibility Report July 26, 2021 <br />Public Hearing / Order Improvements August 23, 2021 <br />Accept Plans and Specifications and Authorize Bidding January, 2022 <br />Bid Opening February, 2022 <br />Accept Bids and Authorize Assessment Hearing March, 2022 <br />Assessment Hearing / Adopt Assessment Roll / Award Contract April, 2022 <br />Commencement of Construction May, 2022 <br />Substantial Completion of Construction September, 2022 <br />Certify Assessments to County November, 2022 <br />Warranty Inspection June, 2024 <br /> <br />Conclusion and Recommendation: <br /> <br />It is recommended that a full depth reclamation project for the Arden Oaks neighborhood be <br />completed. Full Depth Reclamation will produce a uniform stable long lasting roadway for the <br />residents of Arden Oaks as well as reduce short-term maintenance. The total estimated cost of <br />the recommended improvements is $583,000. A portion of this project is proposed to be <br />assessed to the benefiting property owners and the remainder through other funding sources. In <br />accordance with the City’s Assessment policy, the preliminary assessment for the recommended <br />improvement is calculated at $6,559 per unit. As the project is designed and competitively bid, <br />the calculated assessment amount will be updated leading up to the adoption of the assessment <br />roll. A 15% Street Improvement Plan is located in exhibit 8. <br /> <br />The improvements are necessary to allow for safe and reliable street and utility services within <br />the Arden Oaks neighborhood. The project will be competitively bid to allow for a cost effective <br />improvement. The feasibility study has provided an overall analysis of the feasible improvements <br />for consideration within this neighborhood. Therefore, the proposed improvements within the <br />Arden Oaks neighborhood as outlined in this report are necessary, cost effective, and feasible <br />from an engineering standpoint. <br /> <br />DRAFT REPORT <br />7-8-2021