My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-26-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
07-26-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2021 8:02:19 AM
Creation date
7/22/2021 2:18:12 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />216111v1 <br /> I. Traffic Control Signs <br />The improvements shall be installed in accordance with the City Code. The Developer will not use power <br />equipment between the hours of 7 o’clock p.m. and 7 o’clock a.m. The Developer shall submit plans and <br />specifications for permit which have been prepared by a competent registered professional engineer to the <br />City for approval by the City Engineer which approval shall be provided on the condition that such <br />submittals comply with the Plans and this Agreement. The Developer shall instruct its engineer to provide <br />adequate field inspection personnel to assure an acceptable level of quality control. In addition, the City <br />may, at the City's discretion and at the Developer's expense, have one or more City inspectors and a soil <br />engineer inspect the work as the City may reasonably determine. The Developer, its contractors and <br />subcontractors, shall follow all instructions received from the City's inspectors. The Developer's engineer <br />shall provide for on-site project management. The Developer's engineer is responsible for design changes <br />and contract administration between the Developer and the Developer's contractor. The Developer or its <br />engineer shall schedule a pre-construction meeting at a mutually agreeable time at the City Council <br />chambers with all parties concerned, including the City staff, to review the program for the construction <br />work. Developer will install sidewalks just prior to the installation of the final lift of asphalt. <br /> 9. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction <br />required by this Agreement, the improvements lying within public easements shall become City property <br />without further notice or action. Upon completion of the public improvements, the City shall inspect the <br />public improvements and notify Developer if any of the improvements do not conform to the requirements <br />of this Agreement. Upon compliance with this Agreement with respect to public improvements, the City <br />shall give formal notice of acceptance to Developer and thereafter Developer shall have no responsibility <br />with respect to the maintenance of the public improvements, except during any warranty periods. <br /> <br /> 10. WARRANTY. The Developer warrants all public improvements required to be <br />constructed by it pursuant to this Agreement for a period of twenty-four (24) months from the date of
The URL can be used to link to this page
Your browser does not support the video tag.