My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-26-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
07-26-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2021 8:02:19 AM
Creation date
7/22/2021 2:18:12 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />216111v1 <br /> C. Implementation if all recommendations listed under paragraph 2. Conditional Use <br />Permit, and the conditions listed under Master Planned Unit Development and Final Planned Unit <br />Development paragraph in City Council Agenda Item -10A – which is a Memorandum dated May 24, 2021 <br />from Jane Kansier, AICP, Bolton & Menk. <br /> <br /> D. The Developer shall pay the cost for the preparation of record construction <br />drawings and City base map upgrading by the City Engineer as part of the Administrative / Engineering Fee. <br /> E. The Developer must obtain a sign permit from the City prior to installation of any <br />signs for the development. <br /> 29. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the <br />terms of this Agreement, payment of the costs of all improvements, and construction of all public and <br />private improvements, the Developer shall furnish the City with a letter of credit, in the form attached <br />hereto, from a bank (“security”) for $109,957.50. The amount of the security includes all of the security <br />requirements set forth in the preceding sections of this Agreement, and was calculated as follows: <br />CONSTRUCTION COSTS: <br />Right-of-Way $15,000.00 <br />Erosion Control/Grading Certification $7,350.00 <br /> <br />OTHER COSTS: <br />Landscaping $65,616.00 <br />TOTAL SECURITIES: $87,966.00 <br /> <br />GRAND TOTAL SECURITIES (125%) $109,957.50 <br />This breakdown is for historical reference; it is not a restriction on the use of the security. The bank shall be <br />subject to the approval of the City Administrator. The irrevocable letter of credit or other security deemed <br />acceptable to the City is referred to throughout this Agreement as the “Security”. The Security shall be in
The URL can be used to link to this page
Your browser does not support the video tag.