My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-26-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
07-26-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2021 8:02:19 AM
Creation date
7/22/2021 2:18:12 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />216111v1 <br />14. All fencing and retaining wall materials shall be complementary to the building materials <br />and shall be approved in writing by the Planning Division prior to issuance of a building <br />permit. Retaining walls greater than four (4) feet in height shall be engineered and detailed <br />calculations shall be submitted to the City. <br />15. Prior to City Council, the Applicant shall submit a materials board to be approved in <br />writing by staff. <br />16. A Grading and Erosion permit shall be obtained from the city's Engineering Division prior <br />to commencing any grading, land disturbance or utility activities. The Developer shall be <br />responsible for obtaining any permits necessary from other agencies, including but not <br />limited to, MPCA, Rice Creek Watershed District, and Ramsey County, MNDOT prior to <br />the start of any site activities. <br />17. The Applicant shall be responsible for protecting the proposed on -site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />18. Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br />review and approve final grading and utility plans in writing. <br />19. Noise screening consisting of suppleme ntal trees and vegetation plantings along west <br />property line screening order and pick up stations must be approved by City staff. <br />20. All deliveries and trash collection are subject to applicable Arden Hills city ordinances which <br />prohibit overnight deliveries. <br />21. Water connection will be a wet tap and there will be no service disruptions to adjacent <br />businesses. <br />22. The west or outer lane of the drive through shall be closed before 8:00 AM and after <br />9:00PM. <br />23. The landscaping on the hotel property along the west side of t he property shall be <br />maintained by Chick-fil-A. <br />24. The canopy lights over each drive-through lane shall be on separate switches. <br />25. The westernmost lights on the canopy on the west side of the building shall be switched off at <br />9:00 PM. <br />26. The City Engineer must verify the location of the stop sign at Red Fox Road. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.