Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – May 5, 2021 6 <br /> <br />6. The Applicant shall be financially responsible for all applicable water and sanitary <br />charges. Rates applied shall be those in effect at the time of Final Plat approval and shall <br />be memorialized in the Development Agreement. <br />7. A right-of-way permit shall be required for work performed within the City right-of- way. <br />8. No exterior storage shall be permitted. <br />9. Prior to the issuance of a land disturbance permit, the Applicant shall submit an operation <br />and maintenance plan for the long-term care of all on-site and off-site stormwater, <br />sanitary sewer, and water main to the City for review and approval. The Applicant will be <br />responsible to carry out these operation and maintenance activities and to submit the <br />appropriate documentation to the City as specified. <br />10. Any future trash enclosures shall utilize wooden gates and be constructed on three sides <br />using the same materials and patterns used on the building. Locations shall be approved <br />by the Planning Department. <br />11. Prior to the issuance of a building permit, a landscape financial security in the amount of <br />125% of the estimated cost of the landscaping shall be submitted. Landscape financial <br />security is held for two full growing seasons. <br />12. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br />preserved shall be visibly marked and city-approved tree protection fencing or other <br />method shall be installed and maintained at the critical root zones of the trees to be <br />protected. The location of the fencing shall be in conformance with the approved tree <br />preservation plan and approved by staff in writing. <br />13. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements. <br />14. All fencing and retaining wall materials shall be complementary to the building materials <br />and shall be approved in writing by the Planning Division prior to issuance of a building <br />permit. Retaining walls greater than four (4) feet in height shall be engineered and <br />detailed calculations shall be submitted to the City. <br />15. Prior to City Council, the Applicant shall submit a materials board to be approved in <br />writing by staff. <br />16. A Grading and Erosion permit shall be obtained from the city’s Engineering Division <br />prior to commencing any grading, land disturbance or utility activities. The Developer <br />shall be responsible for obtaining any permits necessary from other agencies, including <br />but not limited to, MPCA, Rice Creek Watershed District, and Ramsey County, MNDOT <br />prior to the start of any site activities. <br />17. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />18. Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br />review and approve final grading and utility plans in writing. <br /> <br />Planning Consultant Kansier reviewed the options available to the Planning Commission on <br />this matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted