My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
08-09-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2021 8:38:27 AM
Creation date
8/9/2021 8:35:04 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Study <br />Lexington Avenue Reconstruction <br /> <br /> <br />Alliant No. 118-0186.0 21 <br />April 18, 2019 <br />Results of the trip generation estimates indicate the current Phase 3 development plan is expected <br />to generate approximately 33 a.m. peak hour trips, 106 midday/p.m. peak hour trips, and <br />1,036 daily trips. To conservatively estimate additional trips generated by Phase 3, trips will not <br />be subtracted for existing land uses to be removed by Phase 3 construction. It should be noted that <br />to provide conservative trip generation estimates for the Phase 3 development, no multi-use or <br />pass-by trip reductions were applied. <br />3.1.3 – YMCA/Island Lake Golf Course <br />Within the City of Shoreview 2040 Comprehensive Plan, potential redevelopment of the <br />Island Lake Golf Course and the vacant lot adjacent to the YMCA facility at 3760 Lexington Ave <br />is discussed at length, with low to medium-density housing likely being considered. Recent <br />discussions with Ramsey County staff indicate that if the golf course were to cease operations, the <br />associated land would likely remain a park in some capacity rather than being redeveloped. <br />Therefore, as part of the trip generation process, no trips associated with this potential <br />redevelopment were included. <br />3.2 Trip Distribution and Assignment <br />The distribution of Lexington Station – Phase 3 development traffic was estimated based on the <br />Lexington Station Traffic Study (dated May 20, 2013, completed by SRF Consulting Group) <br />distribution developed for all three phases of development. This distribution was reviewed based <br />on existing traffic volumes/patterns, engineering judgement, and was found to be appropriate for <br />this study. The estimated proposed development directional distribution is shown in Figure 7. <br />Trips were then assigned to study intersections based on this distribution for the forecast year 2040 <br />conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.