My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
08-23-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 10:52:26 AM
Creation date
8/23/2021 10:43:08 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 25, 2021 <br /> <br />RE: Arden Oaks Street Improvements – Property Owners Questionnaire <br /> City Project Number PW-21-0109 <br /> <br />Dear Resident of Arden Oaks: <br /> <br />The City of Arden Hills has initiated the process of roadway rehabilitation and utility <br />improvements for the summer of 2022 which includes your neighborhood. Over the next couple <br />months, the City will be collecting data and studying your neighborhood street. A feasibility <br />report will be prepared that includes information about the recommended improvements and <br />associated costs. The Arden Hills City Council ordered the preparation of a feasibility report for <br />the Arden Oaks Neighborhood Improvements at the April 26th, 2021, city council meeting. <br /> <br />Things to know and consider as the project moves forward: <br /> <br />x Surveyors will be working on your street very soon to collect topographic data for the <br />street improvement project. The surveyors take ground shot data to locate key features <br />within the project area. They may take shots into your yard and driveway to locate <br />certain features and ground slopes. <br />x Residents pay a portion of the overall project cost in the form of a special assessment. <br />You will not be billed for the special assessment until 2022. <br />x Estimated special assessments for your neighborhood will not be determined until after <br />information has been gathered from the questionnaires and a feasibility report is <br />completed. <br />x An informational virtual presentation detailing the project will be available for viewing <br />on the cities website in the coming weeks after all information has been collected and <br />considered. <br />x Components of a project vary and are based on questionnaire responses. Special <br />assessments typically include the cost of the new roadway. Other utility upgrades such as <br />water main, sanitary sewer, and storm sewer are funded through utility funds and are not <br />assessed. <br />x Construction typically starts in spring/early summer and ends in late fall of the same year. <br /> <br />Another important step is to collect feedback from you regarding your street. The information <br />you share with us is essential in determining certain aspects of the project that may be <br />constructed. <br /> <br />The following information explains the questionnaire that is enclosed. A map showing the <br />boundaries of the area to be reconstructed is also enclosed. After reading this letter completely, <br />please complete the questionnaire and return by June 10th, 2021, in the self-addressed stamped <br />envelope. <br /> <br />Drainage and Erosion Issues <br />The City would like to know about any local drainage problems that you may have.
The URL can be used to link to this page
Your browser does not support the video tag.