My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
08-23-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 10:52:26 AM
Creation date
8/23/2021 10:43:08 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Background <br />•Planning Case 18-014 –Planned Unit Development Approved May 22, 2019 & Amended April <br />27, 2020. <br />•PUD requires the safety improvements on Lake Valentine Road to address traffic and <br />increased pedestrian crossings between the school building and the north parking lot to be <br />completed prior to the 2021-2022 school year. <br />•Phase 1 safety improvements, installed in 2020, included installation of a pedestrian traffic <br />signal system, crosswalk markings, temporary painted center median, curb ramps and <br />sidewalk pedestrian routes to the front of the school. <br />•Phase 2 was scheduled for construction in 2021 in order to provide time to potentially acquire <br />additional property from the State of Minnesota. <br />•The School District has been unsuccessful the past 2 years in obtaining an easement or <br />acquisition of land. The Applicant believes this option is no longer feasible and is preparing an <br />alternate design.
The URL can be used to link to this page
Your browser does not support the video tag.