Laserfiche WebLink
Existing Conditions• Street improvement length 0.52 Miles• Originally constructed in the mid to late 1980s• Mill and overlay occurred in 1996• Pavement rating in the low 30s out of 100 • Concrete curb and gutter in good condition• Existing pavement depth 5-6 1/2 inches• Gravel Base 5-13 inches• Clay with sand beneath roadway