Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – August 4, 2021 5 <br /> <br />Commissioner Wicklund moved and Commissioner Weber seconded a motion to <br />recommend approval of Planning Case 21-016 for Site Plan Review at 3900 Bethel Drive <br />based on the findings of fact and the submitted plans, as amended by the conditions in the <br />August 4, 2021, report to the Planning Commission. A roll call vote was taken. The motion <br />carried unanimously (5-0). <br /> <br /> <br />B. Planning Case 21-017; Mounds View Public Schools – Amendment to the Approved <br />Planned Unit Development – Public Hearing <br /> <br />Senior Planner Jagoe stated Mounds View Public Schools (“The Applicant”) the applicant is <br />requesting a Planned Unit Development (PUD) Amendment for an extension for the timing of <br />construction of road and safety improvements as it relates to the alignment of Lake Valentine <br />Road at 1900 and 1901 Lake Valentine Road. <br /> <br />Senior Planner Jagoe explained at their May 22, 2019 and subsequently amended on April 27, <br />2020, the City Council approved Planning Case 18-014 for a Planned Unit Development with <br />Mounds View Public Schools for Mounds View High School. The amendment added 14 <br />additional conditions to the existing Planned Unit Development to address existing traffic and <br />pedestrian safety issues based on the findings contained within the study report, an evaluation of <br />existing site conditions, and the Planned Unit Development Agreement. The terms of the PUD <br />approval requires the School District to implement safety improvements on Lake Valentine Road <br />to address traffic and increased pedestrian crossings between the school building and the north <br />parking lot, including installation of turn lanes and other access improvements, trail and sidewalk <br />improvements, pedestrian signal, signage and striping modifications, and drainage and utility <br />improvements. <br /> <br />Senior Planner Jagoe reported the Applicant originally proposed two separate phases of traffic <br />and pedestrian safety improvements for Lake Valentine Road. Phase 1 safety improvements, <br />installed in 2020, which included installation of a pedestrian traffic signal system, crosswalk <br />markings, temporary painted center median, curb ramps and sidewalk pedestrian routes to the <br />front of the school. <br /> <br />Senior Planner Jagoe commented the Phase 2 traffic and pedestrian safety improvements were <br />scheduled for construction in 2021 in order to allow the School District to acquire additional <br />property from the State of Minnesota. This additional property would allow the relocation of the <br />west entrance to the north parking lot to align with the drop-off/pick-up lot on the south side of <br />Lake Valentine Road. Additional improvements include construction of a center median at the <br />crosswalk, modifications to the south boundary of the north parking lot, and the construction of <br />dedicated right turn lanes for westbound traffic accessing the east parking lot entrance and for the <br />eastbound traffic accessing the drop-off/pick-up lot. <br /> <br />Senior Planner Jagoe reviewed the surrounding area, the Plan Evaluation and provided the <br />Findings of Fact for review: <br /> <br />1. The properties located at 1900 and 1901 Lake Valentine Road are located in the R-1 <br />Single Family Residential District.