Laserfiche WebLink
ϵͬϭϱͬϮϬϮϭ <br />ϯ <br />Design Analysis <br />‡Evaluation of alternative designs for the corridor <br />‡Develop options w/ improved pedestrian safety <br />‡Conducted 3 meetings with Metro State Aid (MSA) office <br />‡Discussed possibility of a variance from Variance Advisory Committee <br />‡SA staff showed a lack of confidence for variance approval until corridor had <br />been vetted thoroughly against SA rules <br />‡Design options that meet SA Standards exist w/ desired facilities <br />‡Project Costs are not a sufficient reason for a variance <br />Applicable State Aid Design <br />Standards – Chapter 8820 <br />ϱ <br />ϲ