My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2021
>
08-23-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 10:08:10 AM
Creation date
9/28/2021 10:08:02 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—AUGUST 23, 2021 3 <br /> 8. PUBLIC HEARINGS <br /> A. Arden Oaks Street Improvement Project <br /> i Council adopted Resolution 2021-042 <br /> n July 26 2021 the City Larry Poppler, TKDA, stated o J y y p <br /> receiving the feasibility report and calling for a public hearing to consider proposed improvements <br /> for the Arden Oaks Street Improvements Project. Projects involving special assessments generally <br /> require two public hearings commonly known as an improvement hearing and an assessment <br /> hearing. The subject hearing for August 23 is the improvement hearing. The purpose of the <br /> improvement hearing is for the City Council to discuss a specific local improvement before <br /> ordering it done. The second public hearing is the assessment hearing which is scheduled after the <br /> project has received contractor bids to provide property owners an opportunity to express <br /> concerns about the actual special assessments. <br /> Mr. Poppler discussed the existing conditions of the Arden Oaks Street Improvement area noting <br /> it was originally constructed in the mid to late 1980's. He noted the pavement received a rating of <br /> 30 out of 100, but the concrete curb and gutter was in good condition. He did not recommend a <br /> mill and overlay for this roadway. Rather, staff recommended a pavement reclamation be pursued. <br /> It was noted as part of the project sanitary sewer rings would be replaced. The estimated costs for <br /> the project were reviewed, along with the project timeline. The reclamation process was discussed <br /> in further detail and staff recommended the Council hold a public hearing on the Arden Oaks <br /> Street Improvement Project. <br /> Councilmember Holmes explained the City was investigating the trucks that are turning around <br /> in the neighborhood. <br /> Mayor Grant discussed the City's assessment policy noting the expense for the street was split <br /> 50150 between the City and the benefiting residents. <br /> Councilmember Scott asked if this project were to move forward, residents would pay <br /> approximately$65.40 per month beginning in 2023. <br /> Mayor Grant indicated residents have the ability to pay assessments up front or over time. <br /> Mayor Grant opened the public hearing at 7:30 p.m. <br /> Paul Smyth, 1453 Arden Oaks Drive, asked how residents would get in and out of the <br /> neighborhood during the project. <br /> Mr. Poppler explained this project would not be as intrusive as a full reconstruction. He <br /> discussed how long it would take for concrete work to cure and how this may require residents to <br /> park next to the curb during this time. He commented at all other times during the project, <br /> residents would have access to their driveways. <br /> Tom House, 1483 Arden Oaks Drive, requested staff include the neighbors in the cul-de-sac <br /> design. He reported the traffic that was going through the street was unacceptable. He requested <br /> further information on how garbage and mail would be handled during construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.