Laserfiche WebLink
ARDEN HILLS CITY COUNCIL—AUGUST 23, 2021 9 <br /> MOTION: Councilmember Holmes moved and Mayor Grant seconded a motion to adopt <br /> Resolution #2021-046 — Ordering Improvement and Preparation of Plans and <br /> Specifications for the Arden Oaks Street Improvement Proiect. A roll call <br /> vote was taken. The motion carried (4-0). <br /> B. Resolution 2021-047 Ordering Improvements and Preparation of Plans and <br /> Specifications — Lexington Avenue and target Road Traffic Signal System <br /> Improvements <br /> Interim Public Works Director Swearingen stated following the public hearing under agenda <br /> item No. 813, this next step in the project delivery process is to approve a resolution ordering the <br /> improvements and the preparation of plans and specifications for Lexington Avenue and Target <br /> Rd Traffic Signal System Improvements. The resolution document would order the improvements <br /> and plans in accordance with the recommendations provided in the project feasibility report. <br /> MOTION: Councilmember McClung moved and Councilmember Holmes seconded a <br /> motion to adopt Resolution #2021-047 Ordering Improvements and <br /> Preparation of Plans and Specifications for the Lexington Avenue and Target <br /> Road Traffic Signal System Improvements. A roll call vote was taken. The <br /> motion carried (4-0). <br /> C. Planning Case 21-017 — Planned Unit Development Amendment — Mounds <br /> View Public Schools <br /> Senior Planner Jagoe stated the City Council approved Planning Case 18-014 for a Planned Unit <br /> Development with Mounds View Public Schools for Mounds View High School in 2019 and <br /> subsequently amended in 2020. The amendment added 14 additional conditions to the existing <br /> Planned Unit Development to address existing traffic and pedestrian safety issues based on the <br /> findings contained within the study report, an evaluation of existing site conditions, and the <br /> Planned Unit Development Agreement. The terms of the PUD approval requires the School <br /> District to implement safety improvements on Lake Valentine Road in two phases to address <br /> traffic and increased pedestrian crossings between the school building and the north parking lot, <br /> including installation of turn lanes and other access improvements, trail and sidewalk <br /> improvements, pedestrian signal, signage and striping modifications, and drainage and utility <br /> improvements. The current schedule in the approved PUD does not allow the School District <br /> sufficient time for completion in 2021 due to design changes for realignment on school district <br /> land. The Applicant is requesting the City Council consider an extension of the deadline to 2022. <br /> Senior Planner Jagoe offered the following Findings of Fact: <br /> 1. The properties located at 1900 and 1901 Lake Valentine Road are located in the R-1 <br /> Single Family Residential District. <br /> 2. The proposed conditions when implemented will create a safer environment for pedestrian <br /> movement across Lake Valentine Road. <br /> 3. The proposed roadway improvements will improve traffic flow through the road section <br /> adjacent to the school. <br />