My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-11-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
10-11-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2021 1:26:17 PM
Creation date
10/7/2021 1:22:40 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL – SEPTEMBER 27, 2021 4 <br /> <br />subject to compliance with the applicable sign district regulations. The Applicant is seeking <br />flexibility to Sign District 4. <br /> <br />Senior Planner Jagoe explained in 2013, Bethel University acquired the Country Financial <br />facility at 2 Pine Tree Drive. The subject property is located within the B-2 General Business <br />District, where higher educational uses are permitted by Conditional Use Permit (CUP). At its <br />November 25, 2013 meeting, the City Council approved a CUP for Bethel University to use the <br />existing facility as higher education. The campus is referenced as their “Anderson Center” <br />location. The approx. 227,000 square foot multi-tenant building is a mixture of higher education <br />and office/commercial uses. <br /> <br />Senior Planner Jagoe reported the property was subdivided in 2020 and split into three lots and <br />an outlot to be used for utilities and access drive within the plat. Bethel University retained their <br />parcel with existing development and Outlot A. At that same time, a Master Planned Unit <br />Development was approved. Subsequently a Planned Unit Development (PUD) was approved in <br />January 2021 for New Perspective Senior Living to be developed on Lot 1. Lot 2 was sold to the <br />Lake Johanna Fire Department and is currently undeveloped. Bethel University has an existing <br />multi-tenant freestanding sign that is located along Pine Tree Drive on Lot 2. They are planning to <br />move the multi-tenant freestanding sign to Outlot A which is owned by Bethel University. With <br />this relocation, the Applicant is planning upgrades to the freestanding sign design and size. <br /> <br />Senior Planner Jagoe reviewed the Site Data and Plan Evaluation in further detail with the <br />Council and requested the Council hold a Public Hearing. <br /> <br />Mayor Grant stated there was 15 feet of right of way from the curb on Pine Tree Drive. <br /> <br />Senior Planner Jagoe reported this was the case. She explained from the road edge to the sign <br />front there would be 20 feet. <br /> <br />Councilmember Holmes questioned how far south the sign would be from County Road E2. <br /> <br />Senior Planner Jagoe indicated there was one property north of this, meaning the sign would be <br />just south of the Old National Bank property. <br /> <br />Councilmember Holmes reported this sign would be located along the new road. <br /> <br />Senior Planner Jagoe stated this was the case. Further discussion ensued regarding the location <br />of the new sign. <br /> <br />Councilmember Scott clarified the existing sign was being removed in order for the new sign to <br />be installed. <br /> <br />Senior Planner Jagoe reported this would be done in order to move the sign from the fire <br />department property to Bethel property. <br /> <br />Mayor Grant opened the public hearing at 7:26 p.m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.