Laserfiche WebLink
<br /> <br /> <br />Page 2 of 17 <br />existing lot line to the east. The site is currently developed with a vacant industrial building and <br />associated parking lot. The applicant is proposing to demolish the existing building and redevelop <br />the site with a new +/- 19,480 square foot ALDI grocery store and an additional pad site with an <br />+/- 5,300 square foot building purposed for a national dental tenant (~ 2,800 square feet) and Bank <br />of America (~2,500 square feet). <br /> <br />2. Previous City Council Review <br />The City Council discussed this project at a Work Session on April 26, 2021. Minutes from the <br />meetings are included in Attachment N. <br /> <br />Plan Evaluation <br /> <br />A PUD proposal shall identify any requested modifications from the applicable zoning <br />requirements as well as the reasons why the modifications would be in the public interest and <br />would be consistent with the purpose of the underlying B-3 District. Modifications to these <br />requirements may be granted by the City without a variance through the PUD process. A full <br />evaluation of the proposal was presented to the Planning Commission on September 8, 2021. The <br />memo to the Planning Commission on this case is provided in Attachment L. Draft minutes from <br />the meeting are included in Attachment M. <br /> <br />Chapter 11, Subdivisions <br />1. Preliminary and Final Plat <br /> <br />A. Lot Line Adjustment and Planned Unit Development <br />The Applicant is proposing to plat the Subject Property to adjust the lot lines between the two <br />parcels as shown in the image below. The redevelopment of the site will consist of two buildings <br />that function under shared parking, access, maintenance, and other items. In the B-3 zoning <br />district, proposals for new construction, redevelopment of a site, and significant modifications to <br />existing sites shall use the Planned Unit Development (PUD) process. A PUD promotes the <br />development of land in a unified manner by treating the entire development as a single entity. <br />The purpose of the PUD process is to achieve a higher quality and better project than would <br />otherwise be possible if the strict application of the zoning and subdivision requirements were <br />met. <br />The platting process is required to create new parcels of land or to adjust the boundary between <br />two parcels unless otherwise exempted under the ordinance. A Final Plat is the final map, <br />drawing or chart indicating the final layout for City approval. The Final Plat includes the detailed <br />survey description for each lot in the plat plus notes and dedication, recording and approval <br />statements. The Final Plat is the “recorded document” submitted to the county register and must <br />conform to all state laws. <br /> <br />The applicant has submitted a project narrative explaining the proposed project in further detail <br />and where flexibility is being requested. A complete plan set has been submitted for the <br />Preliminary Plat, Final Plat, Master PUD, and Site Plan Review for both lots. <br /> <br /> <br />