My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
10-25-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2021 10:13:10 AM
Creation date
10/22/2021 10:09:59 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•Section 1325.05, Subd. 8 applies to New Development, Redevelopment, and Modifications <br />to Existing Sites in the B-2 and B-3 District. Further review of the B-3 District standards may <br />be forthcoming. <br />•Priority for removal of outdated language in the B-2 District: <br />Allows more flexibility in placement of the buildings in B-2 District. <br />Remove a sentence within façade transparency requirements since this flexibility exists <br />through PUD process. <br />Ordinance will continue to require 50% of all first level building facades that front a <br />public street to be comprised of transparent windows or doors. <br />Anticipated that there will be fewer issues on design challenges with building <br />orientation and the back side of a building facing the public street. <br />Proposed changes still ensure that the appearance of blank walls would not face the <br />street. <br />Summary <br />5
The URL can be used to link to this page
Your browser does not support the video tag.