Laserfiche WebLink
• Removed table and debris <br />• Contacted DNR to discuss permitting requirements <br />5.5.3. Pumping report for 2020: When did pump run this year? What was the level when it was shut <br />off? <br />See chart and photo on next page. <br /> <br />5.5.4. Maintenance of existing pumping system: Do we fund in advance? When do we start? Plan <br />communication message and media. <br />Tabled for next meeting. <br /> <br /> <br />5.5.5. Add Grit Chambers to storm drains that empty into Karth Lake and do not have Grit <br />Chambers now. Next Steps: Plan to identify them; Identify likely dates for adding Grit Chambers. <br />Todd Blomstrom and Board. <br />Tabled for next meeting. <br /> <br />6. Next Meeting: We asked Todd to arrange a Zoom meeting of the Board and staff at 6:30 PM on <br />Tuesday, Feb. 9, 2021. <br /> <br />7. Adjourn <br />Respectfully submitted, <br />Gary Gerding, <br />Secretary <br /> <br />2020 2019 2017 2016 <br />Date Info Date Info Date Info Date Info <br />5/1/2020 9.8 6/19/2019 Start Pump <br />9'8" 7/28/2017 Start <br />pumping 4/11/2016 9'0'' <br />5/8/2020 9.4 6/24/2019 9'7" 8/15/2017 9'6" 5/25/2016 9'1'' <br />5/11/2020 9.3 6/28/2019 9'3" 8/22/2017 9'3" 8/3/2016 Started <br />pumping, level <br />5/18/2020 1.1 Pump off 5/15, <br />new stick 1.1 7/8/2019 8'9" 9'3" 10/3/2016 Level at top of <br />stake <br />5/26/2020 1.1 7/23/2019 Pump <br />Inop. 8/28/2017 9'0" 10/30/2016 Level at top of <br />stake <br />6/1/2020 1.2 7/25/2019 Pump <br />Pulled 9/5/2017 8'6" <br />6/8/2020 1.2 9/10/2019 2"over <br />stake 9/11/2017 8'5" <br />6/15/2020 1.1 10/9/2019 4" over <br />stake 9/13/2017 8'2" <br />6/22/2020 1.1 9/18/2017 8'2" <br />7/6/2020 1.1 9/22/2017 Pump <br />removed <br />7/13/2020 1 <br />7/20/2020 0.9 <br />8/3/2020 0.8 <br />8/10/2020 0.8 <br />9/14/2020 0.8