Laserfiche WebLink
City of Arden Hills – 2040 Comprehensive Plan <br /> <br /> <br />Approved: November 2019 <br />6-21 <br />(PUD) process if the intent is to meet the goals of the Comprehensive Plan. The <br />City Code includes PUD regulations that allow for a higher quality and compatible <br />development of property by encouraging reasonable flexibility from applicable <br />standards, including at higher densities than would be allowed under the <br />underlying zoning district and/or guided land use designation. The City has <br />utilized PUDs and PUD Overlays for many residential and commercial <br />developments, which is a trend that is likely to continue given the limited size and <br />amount of land available for new development and potential redevelopment east <br />of Snelling Ave and south of County Road E. <br /> <br />The approved Master Plan for the TCAAP property includes 162.2 acres of <br />residential land and a maximum of 1,460 residential units for an overall maximum <br />gross density of 9.00 units per acre. The gross density includes the <br />neighborhood collector roads; however, it excludes parks, arterial roads, and the <br />water infrastructure. <br /> <br />6.4.11 Staged Development <br /> <br />Since the areas south of Highways 96 and 10 are considered fully developed and <br />there is relatively little vacant property, a five year staged development has not <br />been developed. While a small amount of vacant land exists in the developed <br />portion of the City, development on the vacant land is unlikely to have a <br />significant impact on the City’s or region’s infrastructure. However, the City has <br />identified areas likely available for redevelopment or new development during the <br />2040 planning period (Figure 6.7). <br /> <br />As previously noted in Chapter 5 the demolition and remediation of the TCAAP <br />site was completed in November 2015. Grading of the site and the construction <br />of the main roadway are expected to begin in 2019. At this time, it is expected <br />that private development will begin in late 2019 or 2020. The project is <br />anticipated to be completed in phases over the next 10 to 20 years; however, the <br />development timeline will depend on a number of conditions, including the <br />market, transportation improvements, and other related factors. <br /> <br />The B2 Zoning District and the Gateway Business areas are anticipated to be <br />developed/redeveloped by 2030. Additionally, the City anticipates a 7-acre <br />Medium-Density zoned area bound by Interstate 694 to the south and Snelling to <br />be redeveloped during this time period. Within 20 years the City anticipates <br />redevelopment within the Red Fox/Grey Fox/Lexington Avenue Business Area <br />Again, the specific timing is dependent on a number of factors, but Table 6.4 <br />summarizes the anticipated redevelopment acreage in the city by decade. <br />